RBE No.183/2017: House Building Advance Rules (HBA), 2017

No.F(E)Spl./2008/ADV.3/6 (7th CPC), dated 05.12.2017

Subject: Grant of Advances – Seventh Central Pay Commission recommendations -Amendment to rules on House Building Advance (HBA) to Railway servants.

1.  Consequent upon the decision taken by the Government on the recommendations of Seventh Central Pay Commission, the Ministry of Housing & Urban Affairs (Housing-III Section) vide their OM No.1.17011/11(4)/2016-H-III dated 09.11.2017 have amended the existing provisions relating to the grant of House Building Advance (HBA).
2.  The above mentioned OM of Ministry of Housing & Urban Affairs (MOH&UA) relating to grant of House Building Advance (HBA) will apply mutatis-mutandis to Railway employees also.
Necessary Advance Correction slip to the chapter – XI of the Indian Railway Establishment Manual, Vol.I Revised Edition, 1989 (IREM Vol-I) will follow.
3.  The revised orders are effective from 09.11.2017 i.e. the date of the issue of the aforesaid OM of Ministry of Housing & Urban Affairs (MOH&UA) on House Building Advance (HBA).

Ministry of Housing & Urban Affairs (MOH&UA)

OM No.I.17011/11(4)/2016-H-III, dated 09.11.2017

Subject: House Building Advance Rules (HBA), 2017

The following House Building Advance Rules is in supersession of existing rules on the subject;

1.    Introduction:-

Grant of House Building Advance for Central Government employees is regulated in terms of rules and regulations laid down from time to time by the Ministry of Housing & Urban Affairs (erstwhile Ministry of Urban Development). These rules are as under;

2.    Purpose:-

House Building Advance (HBA) is admissible to an employee for only one of the following purposes;

(i)      Constructing a new house on the plot owned by the employee or spouse, either jointly or individually.

(ii)     Purchasing a plot and constructing a house thereon.

(iii)   Purchasing a plot under co-operative Schemes and constructing a house / flat thereon or acquiring a house through membership of Cooperative   Group Housing Societies.

(iv)    Purchase / construction of house under the self-financing schemes of Delhi Bangalore, UP, Lucknow etc.

(v)    Outright purchase of a new ready-built house / flat from Housing Boards, Development Authorities and other statutory or semi-Government bodies and from registered builders i.e. registered private builders, architects, house building societies, etc, but  not from private individuals.

(vi)    Expansion of living accommodation of an existing house owned by the employee or jointly with spouse. The total cost of the existing, structure (excluding cost of land) and the proposed additions should not exceed the prescribed cost ceiling under these rules.

(vii)   Repayment of loan or advance taken from a Government or HUDCO or private sources even if the construction has commenced, subject to certain conditions.

(viii)  Existing employees who have already taken Home Loans from Banks and other financial institutions are allowed to migrate to this scheme, subject to fulfillment of extant conditions.

(ix)    Constructing only residential portion of the building on a plot earmarked for a shop-cum-residential plot, in a residential colony, subject to rescribed cost ceiling.

3.    Eligibility:-

(i)       All permanent government employees.

(ii)      All other employees with at least 5 years of continuous service, provided they do not hold permanent appointment under a State Government and the sanctioning authority is satisfied about their likely retention in service till the house is built and mortgaged.

(iii)     Members of All India Services deputed for service under the Central Government / Company / Association / Body of individuals whether incorporated or not, which is wholly or substantially owned or controlled by the Central Government or an International Organization, and autonomous body not controlled by Government or Private Body.

(iv)     Employees of Union Territories and North East Frontier Agency.

(v)      Staff/ Artistes of the All India Radio who fulfill the condition prescribed at (ii) above and have been appointed in long term contracts extending to the age as per extant rules.

(vi)   Central Government Employees governed by The Payment of Wages Act, 1936.

(vii)    Central Government Employees on deputation to another Department or on Foreign Service. Such cases to be processed by the Head of the Office of the Parent Department.

(vii)    Extant rules for eligibility conditions of Ex-servicemen and of central government employees under suspension remains unchanged.

Note:  In cases where both the spouses are Central Government employees and are both eligible for grant of House Building Advance, the advance will be admissible to both of them jointly separately.

4.    Cost Ceiling Conditions:-

(I)      Cost of the house to be built / purchased (excluding the cost of plot) should not exceed 139 times of the basic pay of the employee subject  to a maximum of Rs.1.00 Crore (One Crore) only. In individual cases, if the Administrative Ministry is satisfied on the merits of the case, the cost ceiling may be relaxed up to a maximum of 25% by the Head of the Department.

5.    Amount of Advance:-

(i)    Only one advance shall be sanctioned to the government servant during his / her entire service;

(ii)  The maximum amount of advance shall be;

(a)   34 months basic pay subject to a maximum of Rs.25.00 lakhs only (Rs.Twenty five lakhs), or cost of the house / flat, or the amount according to repaying capacity, whichever is the least for construction / purchase of new house / flat.

(b)     For expansion of existing house, the amount of HBA will be limited to 34 months basic pay subject to maximum of Rs.10.00 lakhs only (Rs. Ten lakhs), or the cost of the expansion,  or the amount according to repaying capacity, whichever is the least.

(c)   The amount of the advance shall be restricted to 80% of true cost of the land and construction of house or cost of expansion of living accommodation in the case of construction in rural areas. This can be relaxed and 100% can be sanctioned if the Head of the Department certifies that the concerned rural area falls within the periphery of town or city.

6.    Repayment Capacity:-

For the purpose of calculating the admissible loan amount, the repayment capacity of the central government employee shall be calculated as below;

a

In cases of employee retiring after 20 years 40% of basic pay

b

In cases of employee retiring after 10  years  but  not  later  than  20 years Up to 40% of basic pay.  65%  of  DCRG may also be adjusted

c

In  cases   of   employee   retiring within 10 years Up to 50% of basic pay DCRG up to 75% can be adjusted

7.    Applicable Rate of Interest and Methodology of Recovery of House Building Advance:-

(i)   The Interest on Housing Building Advance for the financial year 2017-18 onwards shall be 8.50%. This shall be reviewed every 03 years to be notified in consultation with Ministry of Finance.

(ii)   The methodology of recovery of HBA shall continue as per the existing pattern of recovery of principal first in the first 15 years in not more than  180 monthly installments and interest thereafter in next 05 years in not more than 60 monthly installments. The advance carries simple interest from the date of payment of first installment.

(iii)   All cases of subsequent tranches / installments of HBA being taken by the employee in different financial years shall be governed by the applicable rate of interest in the year in which the HBA was sanctioned, in the event of change in the rate of interest.

Note: The clause of adding a higher rate of interest at 2.5% (two point five percent) above the prescribed rate during sanction of House Building Advance, as reproduced below, stands withdrawn.

“Sanction should stipulate the interest 2.5% over and above the scheduled rates with the stipulation that, if conditions attached to the sanction including those relating to the recovery of amount are fulfilled completely to the satisfaction of competent authority, a rebate of interest of the extent of 2. 5% will be allowed”.

8.   Disbursement:-

(i)    Advance for purchase of ready built house can be paid in one lump sum as soon as the applicant executes an agreement in the prescribed form.  The employee should ensure that the house is purchased and mortgaged to the Government within 3 months of drawl of the advances.

(ii)   Advance for purchase / construction of new flat may be paid either in one lump sum or in convenient installments at the discretion of the Head of Department. The employee should execute the agreement in prescribed form before the advance / first installment of advance is paid to him / her. The amount drawn by the employee should be utilized for the purchase / construction of the flat within 01 month.

(iii)   Advance for construction / expansion of living accommodation, etc, shall be payable in two installments of 50% each. The first installment will be paid after the plot and proposed house / existing house is mortgaged and the balance on the construction-reaching   plinth level.

(iv)   Advance for expansion to be carried out on the upper storey of the house will be disbursed in two installments, first installment on executing the mortgage deed and the second installment on the construction reaching roof-level.

(v)   In the case of advance for purchase of plot and construction of house, the advance will be disbursed as below;

(a)   Single Storeyed House: After agreement in prescribed form is executed on production of surety bond, 40% of the advance or actual cost will be disbursed for purchase of plot. The balance amount will be disbursed in two equal installments, first after the mortgage is executed and second on the construction reaching plinth level.

(b)  Double  Storeyed House: 30% of advance for cost of plot will be disbursed on executing  the agreement. The balance amount will be disbursed in two equal installments, the first on executing the mortgage deed and the second on construction reaching plinth level.

9.   Mortgage and Creation of Second Charge:-

(a)   House shall be mortgaged on the behalf of President of India. However, the employee, if he wishes to take a second charge to meet the balance cost of the house / plot or flat from recognized financial  institutions, then he / she may declare the same and apply for NOC at the time of the applying for HBA. NOC for second charge will be given along with sanction order of HBA. The total loan form HBA and from all other sources cannot be beyond ceiling cost of the house as defined under para 4 above.

(b)   In case if HBA is availed by both husband / wife jointly;

(i)    HBA Mortgage paper, insurance paper and other papers regarding property shall be submitted to one of the loan sanctioning authorities of their choice.

(ii)    A No Objection Certificate may be obtained from the 2nd loan sanctioning authority.

(iii)   The property mortgaged to behalf of President of India, shall be reconvened on the prescribed form to the central government employee concerned (or their successors in interest, as the case may be), after the advance together with interest thereon, has been repaid to Government in full and after obtaining No Demand Certificate in respect of HBA loan sanctioned by the 2nd loan sanctioning

10.   Insurance:-

(a)  Immediately on completion of construction / purchase of house / flat, the employee shall. insure the house with the recognized institutions as approved by Insurance  Regulatory  and Development Authority (IRDA), for not less than the amount of advance and shall keep it so insured against damage  by fire, flood and lightning till the advance  together  with interest thereon is repaid in full and deposit the policy documents with the Head of the Department  (HOD). Renewal of insurance will be done every year and premium receipts produced for inspection of the HOD regularly.

(b)  Penal interest of 2% over and above existing rate of interest will be recovered from the employee for those periods which are not covered by insurance of the house.

11.   Migration:-

For existing House Building Advance beneficiaries who wish to migrate, a separate order for migration to the revised House Building Advance rules will be issued shortly.

12.   Extant rules:-

Apart from above stated changes in relevant sections in the earlier version of House Building Advance rules, all other extant rules shall continue to apply till further orders.

13.   This issues in consultation with Comptroller & Auditor General, in so far as the persons working in the Indian Audit & Accounts Department concerned.

14.   Hindi version will follow.

15.   This comes to the effect from the date of issue.

Download Railway Board Circular RBE No.183/2017

Forward reference ⇒RBE No.53/2018, RBE No. 19/2020, RBE No.29/2024,

10 thoughts on “RBE No.183/2017: House Building Advance Rules (HBA), 2017

  • March 24, 2018 at 10:46 pm
    Permalink

    मैं ऋषिकेश कुमार पद – ट्रैकमैन के पद पर 8वर्ष से पूर्व मध्य रेलवे सोनपुर डिवीजन में कार्य करता हूँ मैं हाउसिंग एडवांस लेना चाहता हूँ कैसे और कहाँ से प्राप्त करना होगा मुझे सुझाव दिया जाए किसी से पुछता हूँ तो कहता हैं पता नहीं है इसके लिए अप्लाई फार्म कहा मिलेगा मेरा नम्बर 9431697997 है
    मैं सदा आप का आभारी रहूँगा

    Reply
  • August 31, 2018 at 12:03 pm
    Permalink

    Sir, good afternoon afternoon.
    This is B G Verma working as cash supervisior at BSL Station , I promoted in pay greater 9300-34800 in 01.04.2006.
    As per railway board letter, who promoted from 01.01.2006 to 31.03.2008, will get an extra increment , have you this railway boards letter, if available please forward on a above link.

    Reply
  • December 6, 2018 at 8:59 pm
    Permalink

    SITESHKUMAR FOR RAILWAY EMPLOYEE.PLS.TOLD ME THAT HOW I CAN HBA.FULL PROCESS PROVIDE ME.I AM WESTERN RAILWAY BCT DIVISION POST KHALASI.

    Reply
  • April 21, 2019 at 2:05 pm
    Permalink

    I AM SSE IN RAILWAY. MY BASIC PAY is Rs.74300 and gp rs. 4800/- and service is more than 10 year. I have completed 25 year railways service.
    I have taken a loan for purchase and construction of flat from DHFL . Loan amount for purchase of land has been issued by DHFL is RS. 2300000/-.
    Construction has not been started. I want to transfer my loan amount from DHFL to NC RAILWAY .please suggest that how to transfer loan amount from DHFL to railway.

    Reply
  • April 28, 2022 at 12:23 am
    Permalink

    Will any bank provide me Top Up Load after availing HBA from Railway ?

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *