RBE No. 44/2019: Cadre – Track Maintainers – Revised Distribution of Posts

No.2015/CE-1/GNS/2, dated 08.03.2019

Sub: Revision of percentage distribution of posts of track maintainers.

1. The issue of revision of existing percentage distribution of posts of Track Maintainers has been raised at various fora by both the recognized Federations (AIRF/NFIR). Accordingly, the matter has been examined and keeping in view the functional, operational and administrative requirements and career progression and working conditions of Track Maintainers, it has been decided by Ministry of Railways (Railway Board) with the approval of the President that percentage distribution of posts of Track Maintainers shall be revised as indicated in the table below:-

SN

Designation

Pay Structure as per

Existing percentage distribution of posts

Revised %  distribution of posts

6th CPC

7th CPC

1

Track Maintainer-I

GP Rs.2800

Level-5

6

10

2

Track Maintainer-II

GP Rs.2400

Level-4

12

20

3

Track Maintainer-III

GP Rs.1900

Level-2

22

20

4

Track Maintainer-IV

GP Rs.1800

Level-1

60

50

2. The revised of percentage distribution of posts of Track Maintainers as highlighted in Table above, would be self-financing and an expenditure neutral proposition.
2.1 After working out the financial implications, the matching savings should be effected from the category itself. Wherever, it is not possible to do so from the category itself, the matching savings should generally be arranged from the Civil Engineering Department at the Divisional/ Zonal level. However, there would be no revision of percentage distribution of posts of Track Maintainers without matching savings.
3. All promotions should be made as per norms/ procedure laid down in Board’s letter No.E(NG)I-2012/PMS/1, 13.08.2013 (RBE No. 81/2013) for the unified cadre of Track Maintainers. Instructions regarding minimum residency period for promotion issued by Board from time to time should be followed strictly.
4. The revision of percentage distribution of posts of Track Maintainers will be with reference to the sanctioned cadre strength as on date of issue of this letter. Accordingly, the staff who will be placed in higher grade pay as a result of implementation of these orders will draw pay in higher grades w.e.f. this that. The benefit of revision of percentage will be restricted to the Track Maintainers who are working in the cadre on this cutoff date.
5. These orders will be applicable to the permanent regular cadres (excluding surplus & supernumerary posts) of the Open Line Establishments and Workshops, Production Units & Metro Railway/ Kolkata. Those temporary posts which are in continuous operation for at least three years may also be taken into account for the purpose of applying revise the percentage. This will be subject to certification that these posts are meant for regular activities which will continue and not for any sporadic requirements. These revision orders will not be applicable to ex-cadre & work charged posts which will continue to be based on worth of charge.
6. The pay of staff promoted against the additional higher grade posts as a result of revision of percentage distribution of posts (including chain/ resultant vacancies) will be fixed as per Rule 13 of RS(RP) Rules, 2016 with the benefit of promotional increment, with the usual option for pay fixation as per extant rules.
7. Track Maintainers who retire, resign, expire or are medically de-categorized in between the period from the date of effect of these orders to the date of actual implementation of these orders, will be eligible for the fixation benefits and arrears under these orders w.e.f. date of issue of these orders, if they are otherwise eligible for the said benefits.
8. The Track Maintainers who had earlier refused promotion before issue of these orders and consequently stood debarred for promotion may now be considered for promotion, in relaxation of extant provisions as a onetime exception. This is subject to their indicating in writing that they are willing to be considered for such promotion against the vacancies existing on the date of issue of these orders and arising due to revision of percentage distribution of posts on that date. This relaxation will not be applicable to vacancies arising after the date of effect.
9. This issues in consultation with the Civil Engineering and Finance Directorates of this Ministry.