Training: RBE No.87/2022 – Module of Non-Gazetted Staff of Electrical Department
No.E(MPP)/2022/03/12, dated 26.07.2022
Sub: Revised Training Module of Non-Gazetted Staff of Electrical Department.
1. Vide Board’s letter No.E(MPP)/2019/3/44, dated 27.01.2020 (RBE No.10/2020), revised training module of non-gazetted staff of Electrical Department was circulated to all Zonal Railways/ PUs and uploaded on Railnet under heading MPP Training circulars.
2. However, it was brought to the notice that in the said training module, there is no mention about the training period of JEs, who have been promoted against LDCE Intermediate Apprentice quota (25% LDCE/ IMA) (Qualification XII & ITI). Accordingly, the matter has been reviewed in this office in consultation with IRIEEN, and the revised training module of non-gazetted staff of Electrical Department duly incorporating the training period of JEs who have been promoted against LDCE/ IMA, as forwarded by IRIEEN and approved in Board’s office, has been uploaded under MPP Training Circulars. The same can be viewed or downloaded from Railnet/ Indian Railways website for information and further necessary action.
Revised Training Module
For
JE & SSE
(Electrical Dept.)
ABSTRACT OF REVISED TRAINING MODULE for JE & SSE of ELECTRICAL Department
S. No. | Name of Post | Stream | Duration in week | Page No. |
01 | JE & SSE/Elect (RRB/ IMA/ LDCE/ GDCE/ Compassionate Ground) | TRD | 52 | 6-32 |
02 | JE & SSE/Elect (RRB/ IMA/ LDCE/ GDCE/ Compassionate Ground) | TRS & EMU | 52 | |
03 | JE & SSE/Elect (RRB/ IMA/ LDCE/ GDCE/ Compassionate Ground) | GS, POWER, TL & AC | 52 | |
04 | JE & SSE/Elect. (Drawing) (At Par With above Stream Branch Wise) RRB/ IMA/ LDCE/ GDCE/ Compassionate Ground) | TRD, TRS & EMU, GS, POWER, TL & AC | 52 | |
05 | Promotee JE (IMA i.e. 25% LDCE/ GDCE/ with qualification 12th Std & ITI) | TRD, TRS & EMU, GS, POWER, TL & AC | 52 | |
06 | Promotee JE (Promoted Through Seniority cum suitability basis ) | TRD, TRS & EMU, GS, POWER, TL & AC | 13 | 33-35 |
07 | Refresher Course for JE & SSE (After every 03 years) | TRD, PSI, RC | 02 | 36-41 |
08 | Refresher Course for JE & SSE (After every 03 years) | General Service | 02 | |
09 | Refresher Course for JE & SSE (After every 03 years) | TL & AC | 02 | |
10 | Refresher Course for JE & SSE (After every 03 years) | LOCO | 02 | |
11 | Refresher Course for JE & SSE (After every 03 years) | EMU | 02 | |
12 | Refresher Course for JE & SSE Elect. (Drawing) (After every 05 years) | TRD, TRS & EMU, GS, POWER, TL & AC | 02 | (At Par With above Stream Branch wise) 36-41 |
Note: RRB – Railway Requirement Board;
IMA – Intermediate Apprentice;
LDCE – Limited Departmental Competitive Examination;
GDCE – General Departmental Competitive Examination
INDEX
Sr. No. | Description | No. of Weeks | Page No. |
(A) INITIAL COURSE FOR App. JE/SSE All CADRE TRD/ TRS/ GS-POWER-TL, DRAWING GROUP | |||
1 | JOINING FORMALITIES (AT OWN HQ/DIVISION) | 01 W | 05 |
2 | PHASE I – FOUNDATION COURSE (FC) & YOGA – MEDITATION – COMMON FOR ALL BRANCH | 13 W | 06-12 |
3 | FIELD TRAINING FOR | 03W Separate for each group | 13 -16 |
3(a) | TRD INCLUDING DRAWING GROUP | 14 | |
3(b) | TRS (LOCO/ EMU/ MEMU) INCLUDING DRAWING GROUP | 15 | |
3(c) | GS-POWER -TL INCLUDING DRAWING GROUP | 16 | |
4 | PHASE-II | 08 W Separate for each group | 17-27 |
(a) | SPECIALIZED TRAINING COURSE IN TRACTION DISTRIBUTION INCLUDING DRAWING GROUP | 18-20 | |
(b) | SPECIALIZED TRAINING COURSE IN TRACTION ROLLING STOCK (LOCO/ EMU/ MEMU) INCLUDING DRAWING GROUP | 21-24 | |
(c) | SPECIALIZED TRAINING COURSE IN GS-POWER -TL INCLUDING DRAWING GROUP | 25-27 | |
5 | GENERAL & SUBSIDIARIES RULES, SAFETY, FIRST AID, FIRE FIGHTING & DISASTER MANAGEMENT (GEN) – COMMON TO ALL BRANCH | 4 W | 29-30 |
6 | COMPUTER TRAINING (CT) –COMMON TO ALL BRANCH | 2 W | 30 |
7 | FAMILIARIZATION WITH OTHER DEPARTMENTS (OD) (C&W, PWAY, S&T) – COMMON TO ALL BRANCH | 2 W | 30 |
8 | ATTACHMENT ON THE JOB EXPERIENCE – COMMON TO ALL BRANCH | 14 W | 31 |
9 | MISCELLANEOUS TRAINING (MT) – COMMON TO ALL BRANCH | 3 W | 32 |
10 | PRESENTATION OF PROJECT WORK (PW) – COMMON FOR ALL BRANCH | 1 W | 32 |
11 | YOGA & MEDITATION – COMMON FOR TO BRANCH INCLUDED IN CTI TRAINING | – | 32 |
12 | POSTING EXAMINATION – COMMON TO ALL BRANCH | 1 W | 32 |
(B) Promotee JE (Promoted Through Seniority cum suitability basis) | 33-35 | ||
(C) REFRESHER COURSE FOR JE/SSE & DRAWING CADRE After every 3 years for TRD/ TRS/ GS/ TL AC & After every 5 years for Drawing Cadre | 33-35 |
1. JOINING FORMALITIES for App. JE/SSE Common For All Streams including Drawing GROUP
Duration | ||
1. JOINING FORMALITIES | 1 Week | |
Place | Division/ Joining unit |
2. Initial Training Course
PHASE –I
for App. JE/SSE
(RRB/ IMA/ LDCE/ GDCE/Compassionate Ground)
Common to All Streams including Drawing Group
Note: RRB – Railway Requirement Board;
IMA – Intermediate Apprentice;
LDCE – Limited Departmental Competitive Examination; GDCE – General Departmental Competitive Examination
2. PHASE- I FOUNDATION COURSE (FC)
Duration: 13 Weeks
Place: IRIEEN
Module No. | Brief Description | Duration |
FC 01 | INTRODUCTION TO WORKING OF RAILWAY ORGANIZATION AND ELECTRICAL DEPARTMENT SET UP, FUNCTIONS OF VARIOUS STREAMS | |
Registration formalities | ||
(i) | General introduction to Indian Railways – Brief History, salient features. | |
(ii) | Organizational structure – Railway administration/ Railway Board setup, Zonal/HQ setup, Divisional setup etc. | |
(iii) | Introduction to Electrical Department- organizational structure, functions, role of electrical department in Railways. | |
(iv) | Various units of Railways, Major Workshops, Production units, RDSO etc. | |
(v) | Duties of JE/ SSEs | |
FC 02 | CONDITION MONITORING | 6 Days |
(i) | Basic concepts of Condition Monitoring of Electrical Equipment | |
(ii) | Condition Monitoring Techniques | |
DC tests – Insulation Resistance, Hi POT etc. | ||
AC tests – Capacitance & Tan delta measurement, Partial discharge, surge comparison test, 3rd Harmonics measurement, Transformer Electrical Tests, DCRM of CB etc. | ||
(iii) | Condition Monitoring of Transformers – Theory and Practice of Dissolved Gas Analysis (DGA), BDV, Capacitance & Tan delta measurement of winding and Bushings etc. | |
(iv) | Condition Monitoring of Power Cables | |
(v) | Non-destructive testing techniques for crack detection like visual testing, Dye Penetrate Testing, Magnetic Particle Testing, Eddy current testing and Ultrasonic testing etc. | |
FC 03 | BASIC ELECTRICAL & ELECTRONICS | 5 Days |
(i) | Various terms, units, theory of passive components – L,C,R, basic principles of electricity and Electromagnetic induction and its laws i.e. Ohm’s law, Kirchoff’s law, etc. | |
(ii) | Classification of electronic components, Active Components – semiconductor physics, construction and operating principle & basic circuit configurations | |
(iii) | Brief on Power Electronic Devices as Diodes, Zener Diodes, LEDs, BJTs, UJT,FET, MOSFET, SCR, GTO and IGBT etc. | |
(iv) | Practical on – Oscilloscopes, testing of passive electronic components, Testing of active components etc. | |
FC 04 | POWER ELECTRONICS | 06 Days |
(i) | Introduction to Converter and Inverter | |
(ii) | Electric Drives-VVF, VVVF drives etc., Parameter setting, Operation etc. | |
(iii) | Overview of power electronics in 3 phase Loco | |
(iv) | Locomotive Static Inverter (SI Unit) | |
(v) | AC Coach Inverter Unit | |
FC 05 | Welding Technology | 02 Days |
(i) | Basics of welding, Classification of various types of welding techniques, gas cutting, laser cutting etc. and their application. | |
(ii) | Safety during welding and gas cutting. | |
(iii) | Welding defects and prevention. | |
(iv) | Classification, properties and selection of electrodes. | |
FC 06 | ENGINEERING MATERIALS AND METALLURGY | 04 Days |
(i) | Ferrous and Non- ferrous Metals used in Railways, | |
(ii) | Brief on Heat treatment processes, Induction heating, | |
(iii) | Brief on Metal wear and Lubrication, | |
(iv) | Plain and roller bearings — Theory, application, selection, storage, maintenance and Do’s and Don’ts | |
(v) | Lubricants Specifications, Properties and Selection used in Rlys. | |
(vi) | Rubber components specifications and storage, | |
(vii) | Electrolytic copper | |
FC 07 | MANAGERIAL SKILLS | 04 Days |
(i) | Aspects of leadership, leadership theory and evolution, | |
(ii) | Leadership v/s Management, | |
(iii) | Role of JE in providing effective leadership. | |
(iv) | Communication Technology – writing & drafting, reading, speaking and listening. | |
(v) | Behaviour Management. | |
(vi) | Team work, Importance of team work in organisation | |
(vii) | Time management, stress management, interactive exercises in team work, games and activities. | |
(viii) | Customer Satisfaction. Thinking from customer point of view – what are their needs/expectations and how can we best serve our customers. | |
(ix) | Positive Attitude, Soft skill | |
(x) | Values in Administration – Ethics | |
(xi) | Yoga & Mental Health | |
FC 08 | MATERIAL MANAGEMENT IN RAILWAYS | 04 Days |
(i) | Introduction to material management. | |
(ii) | Organization structure of material management organisation of Indian Railways, etc. | |
(iii) | Functions of material management — Planning and inventory Management (Stock items, PL no. & non stock items), Procurement, Receipt and Inspection & handling of rejection, etc. | |
(iv) | Modal SOP, IRS-condition of contract , | |
(v) | Store Depot working, Stock verification & audit, etc. | |
(vi) | Scrap disposal | |
(vii) | Non Stock procurement under works programme, RSP , M&P, etc. | |
(ix) | E- Procurement, IREPS, GEM procurement, etc. | |
FC 09 | ESTABLISHMENT & INDUSTRIAL MANAGEMENT (DAR, LEAVE AND PASS RULES) | 6 Days |
Rules relating to leave, passes, travel on duty | ||
Promotion of artisans, Quarters, Staff Welfare etc. | ||
Industrial relations and role of trade unions. | ||
Discipline and Appeal Rules. | ||
Conduct Rules. | ||
Basics of RTI and Disabilities Acts and our obligations and Responsibilities. | ||
Labour Laws and hours of employment rules (HOER) | ||
Rajbhasha | ||
Establishment powers of JE & SSE in open line. | ||
FC 10 | Contract Management & Financial management | 4 Days |
(i) Contract Management | ||
(a) Tenders & Contracts | ||
(b) Vigilance | ||
(ii) FINANCIAL MANAGEMENT | ||
(a) Railway Accounting and Financing Procedures | ||
(b) Primary units, various demands | ||
(c) Works programme, M&P and RS programme | ||
(d) Stages of budgeting (Revised and Budget Estimates, August Review, Final Modification) | ||
(e) Role of JE & SSE in Tenders & Contracts. | ||
FC 11 | FAMILIARISATION WITH ALL STREAMS OF ELECTRICAL ENGINEERING IN RAILWAYS | 07 Days |
(i) | Familiarization with TRS, TRD, General Services (TL & AC and Power supply). | |
(ii) | Brief introduction of asset of | |
(a) Electric loco – conventional & three phase. | ||
(b) EMU/MEMU – conventional & three phase. | ||
(c) TRD – OHE/ PSI/ RC | ||
(d) General services power supply installation. | ||
(e) Coaching – train lighting & air conditioning. | ||
(iii) | Electrical Inspector General (EIG) sanction | |
(iv) | Overview of Codes, manuals and other publications of electrical department issued by Railway board, RDSO etc.- These topics are to be covered in library by studying available Hard/ soft copies. | |
(v) | Renewable Energy Sources – Solar energy, wind energy etc. | |
(vi) | Visits to various nearby installations of TRD, TL/AC, LOCO, GS, EMU | |
(vii) | Accident Management & Disaster management | |
FC 12 | IE RULES AND ENERGY CONSERVATION | 04 Days |
(i) | Brief on I.E. Rules, Energy Conservation Act, BEE ,ECBC Code, Information on star rated products, etc. | |
(ii) | Global Warming & climate change , clean development mechanism and carbon credits, etc. | |
(iii) | Solar Energy Application | |
(iv) | Energy efficiency measures in Electrical department. | |
FC 13 | ATTACHMENT TO FOLLOWING SHALL BE MADE FOR MAKING FAMILIARIZATION WITH OTHER DEPARTMENTS TO UNDERSTAND THEIR WORKING AND INTER DEPARTMENT COORDINATION. | 06 Days |
(i) | Working of control office/ TPC/ TLC. | Control office |
(ii) | P-Way maintenance/ assets | P.Way Depot/ site |
(iii) | Sick lines, C&W depot/ activities | Sick lines, C&W Depots |
(iv) | Signalling/ RRI working | Signalling/ R RI Depot |
PFGD | Presentation feedback & group discussions | 04 Days |
Examination/ Viva voice | ||
(Topic for presentation will be assigned by IRIEEN) | ||
PHASE I | TOTAL DURATION | 13 WEEKS |
Note: 6 periods per Day
3. Field Training Module Separate to each Group
Module No. | Brief Description | Duration |
3(a) | FIELD TRAINING FOR TRD INCLUDING DRAWING GROUP (Trips will be conducted Stream wise by IRIEEN) | |
Duration | 03 Weeks | |
Place | Various field units like Major Yards having different types of OHE/ OHE depots/ Power supply installations/ PSUs (BHEL/ BEML/ L&T/ ALLIND etc.), Construction sites of Railways. | |
FT | Between the two phases of institutional training. | |
1 | Trainee JE/ SSE should be sent for field training/ field visits, wherein they should be given exposure to practical work at various field units. | |
2 | The field unit may be Major Yards having different types of OHE/ Power supply installations/ PSUs (BHEL/ BEML/ L&T etc.)/ Construction sites of Railways. | |
3 | The object of this training is to familiarise the trainee with the actual assets & their equipment, their manufacturing/ assembling processes so that they can visualise the things during their specialised training. | |
3(b) | FIELD TRAINING (TRS) INCLUDUNG DRAWING GROUP (Trips will be conducted Stream wise by IRIEEN) | |
Duration | 03 Weeks | |
Place | Various field unit may be CLW, Electric Locomotive Workshop having different types of Electric Locos/ Electric Loco Sheds/ Trip Sheds/ PSUs (like BHEL, CGL, Hind Rectifier, BTIPL, ABB, Simplex Casting Ltd. Raipur, VED Sassomeccanica India Pvt .Ltd. Kanpur, etc.) | |
FT | Between the two phases of institutional training. | 3 Weeks |
1 | Trainee JE/ SSE should be sent for field training/ field visits, wherein they should be given exposure to practical work processes at various field units. | |
2 | The field unit may be CLW, Electric Locomotive Workshop having different types of Electric Locos/ Electric Loco Sheds/ Trip Sheds/ PSUs (like BHEL, CGL, Hind Rectifier, BTIPL, ABB, Simplex Casting Ltd. Raipur, VED Sassomeccanica India Pvt. Ltd. Kanpur, etc.). | |
3 | The object of this training is to familiarise the trainee with the actual assets & their equipment maintenance, their manufacturing/ assembling processes so that they can visualise the things during their specialised training | |
3(c) | FIELD TRAINING (GS-TL-OSM) including Drawing Group (Trips will be conducted Stream wise by IRIEEN) | |
Duration | 03 Weeks | |
Place | Various field units like RCF/ ICF/ MCF/ major workshops/ Major coaching depots/ Power supply installations/ PSUs (BHEL/ BEML etc.), Construction sites of Railways. | |
FT | Between the two phases of institutional training. | 3 Weeks |
1 | Trainee JE/ SSE should be sent for field training/ field visits, wherein they should be given exposure to practical work processes at various field units. | |
2 | The field unit may be RCF/ICF/MCF/major workshops/ Major coaching depots / Power supply installations/ PSUs (BHEL/ BEML etc.)/ Construction sites of railways. | |
3 | The object of this training is to familiarise the trainee with the actual assets & their equipment, their manufacturing/ assembling processes so that they can visualise the things during their specialised training. |
4. Initial Training Course
PHASE –II
for App.JE/SSE (RRB/ IMA/ LDCE/GDCE/ Compassionate Ground)
Separate to All Streams
Note: RRB – Railway Requirement Board;
IMA – Intermediate Apprenticeship;
LDCE – Limited Departmental Competitive Examination;
GDCE – General Departmental Competitive Examination.
4(a) | PHASE II – TRD | |
Specialised Training Course in Traction Distribution including Drawing Group | ||
Duration | 08 Weeks | |
Place | IRIEEN | |
Module No. | Brief Description | Duration |
STC-TRD-01 | General Description of Fixed Installations | 2 days |
(i) | Power supply arrangements at sub-station | |
(ii) | Power supply for signalling | |
(iii) | Remote control and communication arrangements | |
(iv) | Overhead Equipment | |
(v) | Special Warning Signals | |
STC-TRD-02 | Overhead Equipment – I | 6 days |
(i) | Duties of SSE and JE (OHE) | |
(ii) | Foundations for OHE Structures | |
(iii) | OHE Structures | |
(iv) | Cantilever Assembly | |
(v) | Regulating Equipment | |
(vi) | Section Insulator | |
(vii) | Isolators | |
(viii) | Droppers | |
(ix) | Neutral Section | |
(x) | Conductors | |
(xi) | Tension length | |
(xii) | Overlap | |
(xiii) | Jumpers | |
(xiv) | Contact wire height | |
(xv) | Stagger | |
(xvi) | Encumbrance | |
(xvii) | Span Length | |
(xviii) | Implantation/ Setting Distance | |
(xix) | Turnout and Crossover | |
(xx) | Clearances | |
(xxi) | Bonding and Earthing | |
(xxii) | Principles of sectioning & Numbering Scheme | |
STC-TRD-03 | Over Head Equipment – II | 5 days |
(i) | Maintenance schedule for overhead equipment. | |
(ii) | Tower wagon operation, maintenance and safety while working. | |
(iii) | Safety rules for OHE. | |
(iv) | Current collection test (OLIVER-G) | |
STC-TRD-04 | Power Supply Installations – I | 6 days |
(i) | Duties of SSE and JE (PSI) | |
(ii) | Traction Power Transformers | |
(iii) | Circuit breaker, Interruptor and Isolator | |
(iv) | Auxiliary Transformer | |
(v) | Current Transformer | |
(vi) | Potential Transformer | |
(vii) | Lighting Arrestor | |
(viii) | Capacitor Bank | |
(ix) | Bonding and Earthing | |
(x) | Batteries and Battery chargers | |
(xi) | Numbering Scheme in PSI | |
STC-TRD-05 | Power Supply Installations – II | 6 days |
(i) | Protective system and Relay setting calculations. | |
(ii) | Maintenance Schedule for power supply installations. | |
(iii) | Energy conservation measures for Traction installations | |
(iv) | Safety during working at power supply installations | |
(v) | Uses of Thermo – Vision Camera, CONDITIONING Monitoring PSI Equipment’s. | |
STC-TRD-06 | 2X25 kV ac Traction System | 2 days |
(i) | Introduction and description of 2X25kV ac Traction System | |
STC-TRD-07 | Remote Control and SCADA system | 3 days |
(i) | Introduction | |
(ii) | Duties of SSE and JE (RC) | |
(iii) | Salient features of SACDA | |
(iv) | System Description | |
STC-TRD-08 | Traction Power Control | 2 days |
(i) | Operation | |
(ii) | Duties of CTPC and TPC | |
(iii) | Power blocks and PTW | |
(iv) | Joint procedure order | |
(v) | Open Access, Transmission lines | |
STC-TRD-09 | Breakdown and Electrical accidents | 2 days |
(i) | Sub-station and switching station breakdown | |
(ii) | Breakdown of RC equipment | |
(iii) | OHE breakdown | |
(iv) | Electrical accidents | |
(v) | Emergency stores and breakdown equipment | |
STC-TRD-10 | Railway Electrification | 2 days |
(i) | Introduction | |
(ii) | Survey Team & its work | |
(iii) | Abstract Estimate and Cost Benefit Analysis | |
(iv) | Format of the project report | |
(v) | Commissioning of Electrical Installations and EIG Sanction | |
STC-TRD-11 | Safety precautions on electrified section | 2 days |
(i) | Station working rules | |
(ii) | Induction effects of 25kV ac 50Hz Single Phase Traction | |
(iii) | Working of steam and diesel locomotives in electrified section | |
(iv) | Loading and unloading of petroleum products | |
(v) | Rules applicable to Permanent Way Staff | |
(vi) | Rules for S&T installations | |
(vii) | Over-dimensioned consignments & JPOs | |
(viii) | Competency certificates | |
(ix) | Others precautions | |
(x) | Regulations for Power Line Crossings of railway Tracks | |
(xi) | New Technology & case studies | |
PFGD | Presentation feedback & group discussions Examination/ Viva voice (Topic for presentation will be assigned by IRIEEN in groups) | 2 days |
PHASE -II | TOTAL DURATION | 08 WEEKS |
4(b) | PHASE II -TRS | |
Specialised Training Course (STC) in Traction Rolling Stock (TRS)/ Loco/ EMU/ MEMU including Drawing Group | ||
Duration | 08 Weeks | |
Place | IRIEEN | |
Module No. | Brief Description | Duration |
STC-TRS-01 | INTRODUCTION OF | 3 Days |
(i) | Basic features of Conventional Locomotive | |
(ii) | Basic features of Three Phase locomotive | |
(iii) | Basic features of Conventional EMU | |
(iv) | Basic features of Three Phase EMU | |
(v) | Basic features of Conventional MEMU | |
(vi) | Basic features of Three Phase MEMU | |
STC-TRS-02 | DETAIL OF CAB EQUIPMENT OF | 3 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
STC-TRS-03 | DETAIL OF BOGIE OF | 3 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
STC-TRS-04 | DETAIL OF ROOF EQUIPMENTS OF | 3 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
STC-TRS-05 | Pneumatic System Of | 3 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
STC-TRS-06 | DETAIL OF MACHINE ROOM | 3 Days |
(i) | Machine Room Items of Conventional Locomotive | |
(ii) | Machine Room Items of Three Phase locomotive | |
(iii) | Motor Coach Conventional EMU | |
(iv) | Driving Coach of Three phase EMU | |
(v) | Motor Coach of MEMU | |
(vi) | Driving Coach Three Phase MEMU | |
STC-TRS-07 | DETAIL OF UNDER FRAME ITEMS OF | 2 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
STC-TRS-08 | Power Circuit Diagram Of | 2 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
STC-TRS-09 | Auxiliary Circuit Diagram of | 2 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
STC-TRS-10 | Control Circuit of | 2 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
STC-TRS-11 | Maintenance Schedule of | 2 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
STC-TRS-12 | Traction Motor of | 2 Days |
(i) | Conventional Locomotive & Three Phase locomotive | |
(ii) | Conventional EMU & Three phase EMU | |
(iii) | Conventional MEMU & Three phase MEMU | |
STC-TRS-13 | Transformer of | 2 Days |
(i) | Conventional Locomotive & Three Phase locomotive | |
(ii) | Conventional EMU & Three phase EMU | |
(iii) | Conventional MEMU & Three phase MEMU | |
STC-TRS-14 | Safety items of | 2 Days |
(i) | Three phase EMU | |
(ii) | Conventional MEMU | |
(iii) | Three Phase MEMU | |
STC-TRS-15 | Testing of | 2 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
STC-TRS-16 | Operating Concepts of | 2 Days |
(i) | Conventional Locomotive | |
(ii) | Three Phase locomotive | |
(iii) | Conventional EMU | |
(iv) | Three phase EMU | |
(v) | Conventional MEMU | |
(vi) | Three Phase MEMU | |
Module No. | Brief Description | Duration |
PFGD | Presentation feedback & group discussions Examination/ Viva voice (Topic for presentation will be assigned by IRIEEN in groups) | 2 Days |
PHASE II | TOTAL DURATION | 08 WEEKS |
Note: 6 periods per Day
4(C) | PHASE II-GS-POWER-TA&AC | |
Specialised Training Course in General Services (Power Supply, TL&AC Coaching) including Drawing Group | ||
Duration | 08 Weeks | |
Place | IRIEEN | |
Module No. | Brief Description | Duration |
STC-GS-1 | Train Lighting | 05 Days |
(i) | Introduction to coaching stock & Train Lighting Systems, theory and practice- SG/ EOG/ HOG schemes. | |
(ii) | Self generating coach and equipment – Alternators, Rectifier/ Regulator, Coach wiring, lighting and fans etc. | |
(iii) | Batteries including VRLA | |
(iv) | V belts and Pulleys | |
(v) | Maintenance schedules of ICF TL coaches | |
(vi) | LHB Non AC coaches, familiarization with major equipment and ratings | |
(vii) | Coach Maintenance depot management, yard stick | |
(viii) | Rake links, Coach Coding | |
(ix) | Relevant Manuals, RDSO, SMIs and Modification Sheets pertaining to TL coaches | |
STC-GS-2 | Air Conditioning | 10 Days |
Fundamentals of Air Conditioning. | ||
Air conditioning systems in various coaches, | ||
LHB AC coaches, familiarization with major equipment ratings, | ||
Maintenance schedules of LHB AC coaches, | ||
Maintenance schedules and practices of LHB Non AC coaches, | ||
Water raising apparatus | ||
Introduction of Power car, its equipments, Maintenance & troubleshooting | ||
Introduction of Pantry car, its equipments , Maintenance & troubleshooting | ||
Relevant Manuals, RDSO SMIs and Modification Sheets pertaining to AC coaches. | ||
STC-GS-3 | Operation and trouble shooting in TL & AC Coaches | 5 Days |
Operating Instructions for SG TL & AC coaches | ||
Trouble shooting in Self Generating coaches | ||
Trouble shooting LHB AC coaches | ||
Fire causes and preventive measures in Railway coaches | ||
Field trip to nearby coaching depot for understanding of LHB and conventional coaches | ||
STC-GS-4 | LHB CIRCUIT DIAGRAM | 3 Days |
Detailed Study of LHB AC Coach circuit Diagram | ||
Detailed Study of LHB Power Car circuit Diagram | ||
Detailed Study of LHB Pantry Car circuit Diagram | ||
STC-GS- 5 | Power Supply Installations (General Services) | 5 Days |
Power distribution systems | ||
Distribution Substation-Design & layout, Equipments, Protection system, lines etc. | ||
Condition monitoring & Preventative maintenance of sub-station equipments | ||
Earthing – Types, uses & maintenance, Earth Electrodes | ||
Building Electrification, wire & cables | ||
Electric accident – causes & prevention | ||
Emergency supply arrangements- DG set, UPS etc. | ||
STC-GS-6 | Pumping Installations, UPS, and illumination | 5 Days |
Water supply pumping installations, types of pumps, their specifications and selection for various applications, | ||
Maintenance & trouble shooting of pumps, Automation of pumps | ||
Illumination Engineering – Theory, Application & latest development, Railway Board guidelines | ||
STC-GS-7 | Passenger Amenities | 5 Days |
Lift & Escalators | ||
Water coolers , Platform utilities | ||
Renewable Energy sources – Theory & application Uses of solar & wind energy in Railway Energy conservation measures | ||
Relevant codes, RDSO SMIs and Modification pertaining to power supply and energy efficiency | ||
Field trip to nearby power supply installations/ manufacturer for practical understanding | ||
PFGD | Presentation feedback & group discussions Examination/ Viva voice (Topic for presentation will be assigned by IRIEEN in groups) | 2 days |
PHASE II | TOTAL DURATION | 08 WEEKS |
Note: 6 periods per Day
For Common to All Streams
including
Drawing Cadre
AT
OWN HQ/DIVISION
5. GENERAL AND SUBSIDIARY RULES, SAFETY, FIRST AID, FIRE FIGHTING & DISASTER MANAGEMENT (Common to all streams of Electrical Engineering) | ||
Duration | 04 Weeks | |
Place | Nominated ZRTI/ ETC | |
Module No. | Brief Description | Duration |
GEN-01 | General and Subsidiary Rules | 12 Days |
The course content for General and Subsidiary Rules training for electrical JE would be developed by respective ZRTIs. This course shall be conducted before sending trainee JE/SSE for attachment/on the job experience. (Ref: RBE No.11/2009, letter No. E(MPP)/2009/3/16, New Delhi, dated 15.01.2010) | ||
GEN-02 | Safety & Electrical accidents | 3 Days |
General safety rules, Importance of PPEs and other safety apparatus. | ||
Preventive measures to avoid electrical accidents | ||
Measures to be taken in case of electrical accident. | ||
Case studies and discussion | ||
GEN-03 | Safety in electrified sections | 3 Days |
Induction effect on the nearby LT lines and yard lighting mains. | ||
Safety precautions to be taken for PF shelters, fencing, FOBs, while working of cranes in the vicinity of OHE. etc. | ||
Operation and Importance of locking of isolating switches of OHE | ||
Importance of permit to work, temporary jumpering of rails in case of rail fracture. | ||
Case studies and discussion | ||
GEN-04 | First Aid and Fire Fighting | 3 Days |
Fire causes and safety measures and various codes | ||
Electrical shock causes, Prevention &treatment etc. | ||
First aid for injury, burns etc. | ||
Audio/ Visual/ live demonstration of firefighting and first aid. | ||
GEN-05 | Disaster Management | 3 Days |
Introduction to Disaster management, NDRF, SDRF etc. | ||
Organizational infrastructure to effectively combat disaster (medical accessories, relief train, essential materials). | ||
Accident & Break down management, preventive steps. | ||
Analysis of breakdowns, case studies and discussion | ||
6. COMPUTER TRAINING (Common to all streams of Electrical Engineering) | ||
Duration | 02 Weeks | |
Place | Any Computer institute/ outsourced agency or Nominated ETC. | |
Module No. | Brief Description | Duration |
CT 01 | Computer training | 02 Weeks |
(a) | Theory and practical to gain proficiency in MS Office – Word, Excel and Power point, e-mail, e-office, e-governance etc. | |
7. FAMILIARIZATION WITH OTHER DEPARTMENTS (C&W, P-WAY & S&T) (Common to all streams of Electrical Engineering) | ||
Duration | 02 Weeks | |
Place | Nearby concerned units of division To make familiar with the working of other departments. | |
Module No. | Brief Description | Duration |
OD 01 | Attachment to following shall be made for making familiarization with other Departments to understand their working and joint official procedure. | 02 weeks |
Working of control office/ TPC/ TLC. | Control office | |
P-Way maintenance/ assets | P.Way Depot/ site | |
Sick lines, C&W depot/ activities | Sick lines, C&W Depots | |
Signalling/ RRI working | Signalling/RRI Depot | |
08. ATTACHMENT ON THE JOB EXPERIENCE (Only For TRD Stream) | ||
Duration | 14 Weeks | |
Place | Allocated field unit where the trainee JE/SSE finally to be posted. | |
Module No. | Brief Description | Duration |
Job Experience | ||
(a) | Final phase of training shall comprise of on the job attachment wherein after completion of institutional and field training, the trainee JE/ SSEs shall be posted in the field units allocated to them by the concerned Railways. | 14 Weeks |
(b) | During this period, the trainees would perform like a supervisor working on an active assignment but would not be given independent charge. | |
(c) | During this period, the trainees shall go through different technician training modules to understand the basic maintenance techniques. | |
(d) | The programme for this attachment/on the job experience would be framed by the Officer in charge of the Division/extra Divisional Field Units where these JE/ SSEs are to be finally posted. | |
(e) | During this period training in TPC, OHE depot, PSI depot (minimum 1 week at each place) | |
(f) | During this training trainee shall select current problem, study and prepare a project report containing details and probable causes and solutions. This should be shown during presentation before final exam. (item no. 10 given below) | |
09. MISCELLANEOUS TRAINING | ||
Duration | 03 Weeks | |
Place | As per requirement in division. | |
Module No. | Brief Description | Duration |
MT | Case studies of identified problems, promoting innovative ideas of trainees shall be explored during this period. | 03 weeks |
Any training which is left over or required for the job of JE/SSE may be framed by officer in charge of divisional/ extra divisional field units. For example: If a JE or SSE is to work in OHE/PSI depot, he should visit major OHE/PSI depots of division to observe different working techniques used, he should also visit any Railway Electrification construction site nearby. | ||
10. PRESENTATION OF PROJECT WORK | ||
Duration | 01 Weeks | |
Place | Divisional / extra divisional field units | |
Module No. | Brief Description | Duration |
PW | During attachment on the job experience training (duration 14 weeks), trainee shall select a current problem, study and prepare a project report containing details and probable causes and solutions. | 01 Week |
This report shall be presented during session including all trainees so as to develop the communication and presentation skills. | ||
11. YOGA & MEDITATION | ||
Module No. | Brief Description | Duration |
YM | Mandatory “Yoga training” as per Railway Board’s circular no. RBE No.64/2015 circulated vide Railway Board’s letter no.E(MPP)2015/3/10, New Delhi dated 15.06.2015, shall be provided to all trainees. The copy of referred letter is enclosed as Annexure-I. | During phase I & Phase II |
Place | IRIEEN | |
12. POSTING EXAMINATION | ||
Duration | 01 Week | |
Place | Concerned Division where he/she will be posted. |
Total Duration = 52 week
B. Promotee JE
(Promoted Through Seniority cum suitability basis)
(Duration – 13 Weeks)
Revised Training Programme for Promotee JEs’ (Promoted Through Seniority cum suitability basis) of Electrical Department | |||
Place | Respective Division/ BTC/ Zonal ETC | ||
Session-I (Theory) | |||
S. No. | Training Module | No. of Days | Duration |
1 | Basic Orientation | 1 | |
2 | Disaster Management | 2 | |
2(A) | (I) FOR Loco /EMU | ||
(a) Accident Performa – Engineering Parameters & Accident diagram, Rolling Stock | |||
(b) Derailment Investigation & Case Study | |||
(II) FOR TRD – TRD Safety | |||
(III) FOR GS – GS Safety | |||
(IV) FOR TL – TL Safety | |||
3 | I E Rules, Permit to Work, Energy Conservation Act | 2 | |
4 | Managerial Skills | 2 | |
5 | Technical English | 2 | |
6 | Computer Awareness | 2 | |
7 | Establishment | 2 | |
8 | Material Management and Inspection | 3 | |
9 | Contract Management | 2 | |
10 | Instrumentation | 2 | |
11 | Basics of Power Electronics | 1 | |
12 | Manufacturing Technology, Engineering Material and Metallurgy | 2 | |
13 | Renewable Energy Sources | 1 | |
Sub Total (Theory General) | 24 | 4 Weeks | |
14 | Specialized Streams (Theory) | ||
(a) | Coaching and General Services | 24 | Only in Respective Branch |
(b) | Traction Distribution | 24 | |
(c) | Traction Rolling Stock and EMU | 24 | |
Sub Total(Theory Specialized Courses) | 24 | 4 Weeks Respective Fields Only | |
Session-II (Practical Training) | |||
15 | Training at TPC and OHE Depot | 18 | Only in Respective Branch |
16 | Training at CLW and LOCO POH Shop | 18 | |
17 | Training at PU and POH Shop (Coach) | 18 | |
18 | On Job Training Stream Wise | 6 | Only in Respective Branch |
Sub Total (Practical Training) | 24 | 4 Weeks Respective Fields Only | |
Session-III (Refreshing/Exam/Viva etc.) | |||
19 | Final Exam/Viva Voce etc. | 6 | 1 Week |
Grand Total | 78 | 13 Week |
5. REFRESHER COURSE FOR
JE/ SSEs
After every 3 years for TRD/ TRS/ GS/ TLAC,
&
After every 5 years for Drawing cadre
Department: Electrical
Activity Centre: TRD
Trade | JE/SSEs (TRD) (Periodicity once in 3 years) |
Stage | Refresher Course For JE/SSEs (TRD)/PSI /RC ( Combined) |
Duration | 2 Weeks |
Module No. | Module Description |
Gen-2.1 | Material Management (Store procurement , up keep, records, inventory management GEM , E –Tendering |
Gen-2.2 | Industrial Management,( DAR, Leave/Pass Rules) |
Gen-2.3 | Financial management (Railway Accounting and Financial procedures) |
Gen-2.4 | Energy conservation |
Elec 2.4 | Codes/ Manuals /SMIs/MIs, pertaining to TRD |
Elec TRD 2.1 | Maintenance Schedules OHE, Switching Stations, Traction sub-stations, Powerline crossings, SCADA Thermo-vision Camera |
Elec TRD 2.2 | Inspection schedules of Officers/ JE , check lists of TRD assets OLIVER – G |
Elec TRD 2.4 | Failure investigation/ case studies on panto entanglement, OHE, mast hitting, sub-station and SCADA failures |
Elec – Safety 2.4 | TRD – Safety Disaster management |
Test/Feedback |
Department: Electrical
Activity Centre: General Services
Trade | Trade: JE/SSEs (Electrical) (Periodicity once in 3 years) |
Stage | Refresher Course For JE/SSEs (Electrical) |
Duration | 2 Weeks |
Module No. | Module Description |
Gen-2.1 | Material Management (Store procurement, up keep, records, inventory management |
Gen-2.2 | Industrial Management,( DAR, Leave/Pass Rules) soft skill & ethics |
Gen-2.3 | Financial management (Railway Accounting and Financial procedures |
Gen-2.4 | Energy conservation |
Elec 2.4 | Codes/ Manuals /SMIs/MIS, pertaining to General services |
Elec 1.6 | Maintenance Schedule and overhauling of energy meter, transformer, switchgears, protection devices, AC motors, alternators, DG sets and pumps ESCALATORS, LIFTS, etc. |
Elec 2.5 | Inspection schedules of Officers/JE , check lists of general services fire prevention measures |
Elec 1.15 | Failure investigation/case studies on general services and plant maintenance energy conservation measures, etc. |
Elec. Safety | GS – Safety |
Genl 2.5 | Disaster management |
Test/Feedback |
Department: Electrical
Activity Centre: Electrical
Trade | Trade: JE/SSEs (TL/AC) (Periodicity once in 3 years) |
Stage | Refresher Course For JE/SSEs (TL/AC) |
Duration | 2 Weeks |
Module No. | Module Description |
Gen-2.1 | Material Management (Store procurement, up keep, records, inventory management |
Gen -2.2 | Industrial Management, (DAR, Leave/ Pass Rules) soft skill & Ethics |
Gen-2.3 | Financial management (Railway Accounting and Financial procedures) |
Gen-2.4 | Energy conservation |
Elec -1.12 | Maintenance Schedule and overhauling of alternators, regulators, invertors, battery, belts, protection devices, AC plants, air conditioned coaches, roof mounted AC package unit LHB COACHES, Hotel Load |
Elec -2.5 | Inspection schedules of Officers/JE, check lists of TL/AC LHB Coach & fire prevention measures |
Elec -1.19 | Failure investigation/case studies on TL/AC |
Elec – Safety | TL – Safety |
Genl 2.5 | Disaster management |
Test/Feedback |
Special emphasis may be given on new generation coaches introduced by railway time to time.
Department: Electrical
Activity Centre: Electrical Loco Shed/ Workshop
Trade | Trade: JE/SSEs (Loco) (Periodicity once in 3 years) |
Stage | Refresher Course For JE/SSEs (TRS) |
Duration | 2 Weeks (01 Week for technical, 01 week for non-technical) |
Module No. | Module Description |
Gen-2.1 | Material Management (Store procurement , up keep, records, inventory management |
Gen-2.2 | Industrial Management,( DAR, Leave/ Pass Rules) |
Gen-2.3 | Financial management (Railway Accounting and Financial procedures) |
Gen -2.4 | Energy conservation |
Elec 2.4 | Codes/ Manuals/ SMIs/ MIs, pertaining to loco |
Elec-Loco-2.1 | Maintenance Schedules and overhauling of Electric loco and its major equipment |
Elec-loco-2.4 | Inspection schedules of Officers/ JE, check lists of electric locomotives |
Elec-loco-2.6 | Failure investigation/ case studies on electric locomotives |
Elect – Safety | (i) Accident Performa – Engineering Parameters & Accident diagram, Rolling Stock |
(ii) Derailment Investigation & Case Study | |
Genl-2.5 | Disaster management |
Test/Feedback |
Department: Electrical
Activity Centre: EMU CAR SHED/WORKSHOP
Trade | Trade: JE/SSEs (EMU-TRS) (Periodicity once in 3 years) |
Stage | Refresher Course For JE/SSEs (EMU-TRS) |
Duration | 2 Weeks |
Module No. | Module Description |
Gen-2.1 | Material Management (Store procurement , up keep, records, inventory management) |
Gen-2.2 | Industrial Management, (DAR, Leave/ Pass Rules) |
Gen-2.3 | Financial management (Railway Accounting and Financial procedures) |
Gen-2.4 | Energy conservation |
Elec 2.4 | Codes/ Manuals/ SMIs/ MIS, pertaining to EMU |
Elec-EMU-2.2 Elec-EMU-2.3 Elec-EMU-2.4 | Maintenance Schedules and ovehauling of EMU equipment viz. TFP, TM, DJ, contactors, relays, lights, arno, auxiliary machines, bogies, suspension, brake rigging, wheels, gears, couplers, compressor, exhauster, valves, panto |
Elec-EMU-2.5 | Inspection schedules of Officers/ JE, check lists of EMU |
Elec-EMU-2.7 | Failure investigation/case studies on EMU |
Elect – Safety | (i) Accident Performa – Engineering Parameters & Accident diagram, Rolling Stock |
(ii) Derailment Investigation & Case Study | |
Genl 2.5 | Disaster management |
Test/Feedback |
*Three phase/ Conventional as per availability in the particular shed in all above modules.
Revised Training Module
for Gr. C & D Electrical Staff (other than JE/SSEs)
INDEX
TRAINING COURSES INDEX OF ELECTRICAL DEPARTMENT
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC.
Course No. | Description | Duration (In Week) | Page No. |
Elect 01 | Initial Course for Group ‘D’ all trades | 02 | 3 |
Elect 02 | Disaster Management | 01 | 4 |
ELECTRICAL TRD DEPARTMENT | |||
Elect 03 | Pre-Promotional Course from Unskilled to Skilled Artisans (Technician OHE) | 03 | 5 |
Elect 04 | Pre-Promotional Course from Unskilled to Skilled Artisans (Technician PSI & RC) | 03 | 6 |
Elect 05 | Initial Course for Apprentice Technician OHE PSI & RC (ITI) | 26 | 7-8 |
Elect 06 | Initial Course for Apprentice Technician OHE PSI & RC (NON-ITI) | 78 | 9-10 |
Elect 07 | Refresher Course for Technician OHE (Once in 5 years) | 02 | 11 |
Elect 08 | Refresher Course for Technician PSI & RC (Once in 5 years) | 02 | 12 |
Elect 09 | Pre-Promotional course from Technician to JE (TRD) | 03 | 13-14 |
Elect 10 | Refresher Course Tower Wagon Operation & Maintenance | 01 | 15 |
ELECTRICAL (G) DEPARTMENT | |||
Elect 11 | Pre-Promotional Course from Unskilled to Skilled Artisans & Technician Plant (Technician Electrical) | 03 | 16 |
Elect 12 | Pre-Promotional Course from Unskilled to Skilled Artisans (Technician TL/AC) | 03 | 17 |
Elect 13 | Initial Course for Apprentice Technician (Elect) & Plant (ITI) | 26 | 18-19 |
Elect 14 | Initial Course for Apprentice Technician (Elect) & Plant (NON-ITI) | 78 | 20-21 |
Elect 15 | Initial Course for Apprentice Technician TL/AC (ITI) | 26 | 22-23 |
Elect 16 | Initial Course for Apprentice Technician TL/AC (NON- ITI) | 78 | 24-25 |
Elect 17 | Refresher Course for Technician (Elect) & Technician Plant (Once in 5 Years) | 02 | 26 |
Elect 18 | Refresher Course for Technician TL/AC (Once in 5 years) | 02 | 27 |
Elect 19 | Pre-Promotional course from Technician to JE(Elect) | 03 | 28-29 |
Elect 20 | Pre-Promotional course from Technician to JE(TL/AC) | 03 | 30-31 |
ELECTRICAL LOCO DEPARTMENT | |||
Elect 21 | Pre-Promotional Course from Unskilled to Skilled Artisans (Technician Elect Loco) | 03 | 32 |
Elect 22 | Initial Course for Apprentice Technician Elect Loco (ITI) | 26 | 33-34 |
Elect 23 | Initial Course for Apprentice Technician Elect Loco (NON-ITI) | 78 | 35-36 |
Elect 24 | Refresher Course for Technician Elect Loco (Once in 5 years) | 02 | 37 |
Elect 25 | Pre-Promotional course from Technician to JE (Elect Loco) | 03 | 38-39 |
ELECTRICAL EMU DEPARTMENT | |||
Elect 26 | Pre-Promotional Course from Unskilled to Skilled Artisans (Technician EMU) | 03 | 40 |
Elect 27 | Initial Course for Apprentice Technician EMU/MEMU (ITI) | 26 | 41-42 |
Elect 28 | Initial Course for Apprentice Technician EMU/MEMU (NON-ITI) | 78 | 43-44 |
Elect 29 | Refresher Course for Technician EMU (Once in 5 years) | 02 | 45 |
Elect 30 | Pre-Promotional course from Technician to JE(EMU) | 03 | 46-47 |
(Elect 01)
DEPARTMENT: Electrical
Activity Centre: ALL
Trade: Group ‘D’ All
Stage: Training Module for initial Course for Group ‘D’ all trades
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
EL01 | Foundation | |
EL02 | Measuring/ Portable Tools | |
EL03 | Basic information on handling/Storing of Material | |
EL04 | Personal Safety, electrical accidents, fire fighting | |
EL05 | First aid | |
EL06 | Material handling & Operation of equipments | |
EL07 | Clearance and upkeep of Working environment | |
Test/Feedback | ||
Total | 2 Weeks |
(Elect 02)
DEPARTMENT: Electrical
Activity Centre: ALL
Trade: Gr. ‘C’ & ‘D’ ALL
(Periodicity once in 5 years)
Stage: Disaster Management
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
El-04 | Personal Safety, Electrical Accidents, Fire Fighting, | |
El-05 | First Aid | |
Gen-2.5 | Concept of Disaster Management, Infrastructural Requirements, efficient management, coordination | |
Case studies | ||
Test/Feedback | ||
Total | 01 Week |
(Elect 03)
DEPARTMENT: Electrical
Activity Centre: TRD
Trade: Technician OHE
Stage: Pre -Promotional Course from Unskilled to Skilled Artisans
(Technician OHE)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms Thermo Vision Camera | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials, | |
ELEC-TRD-1.1 | Names, sizes, location of major OHE equipments (cantilever, Masts, ATD, section insulator, Overlap, turn out, cross over, neutral section etc. Current collection Test (Oliver – G) | |
ELEC-TRD-1.2 | Maintenance schedules, critical points, settings and tolerance of major OHE equipments | |
ELEC-TRD-1.3 | Testing, erection and commissioning of major OHE equipments | |
Test/Feedback | ||
Total | 03 Weeks |
(Elect 04)
DEPARTMENT: Electrical
Activity Centre: TRD
Trade: Technician PSI & RC
Stage:- Pre -Promotional Course from Unskilled to Skilled Artisans
(Technician PSI & RC)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials | |
ELEC-TRD-1.4 | Names, sizes, location of major PSI, sub station and remote control equipments (Power transformers, CB, BM,CT, BT, AT, PT, Relays, Batteries, SCADA, Bonding and earthing etc. | |
ELEC-TRD-1.5 | Maintenance schedules, critical points, settings and tolerance of major PSI, sub-station and remote control equipments Thermo Vision Camera | |
ELEC-TRD-1.6 | Testing, erection and commissioning of major PSI, sub-station and remote control equipments | |
Test/Feedback | ||
Total | 03 Weeks |
(Elect 05)
DEPARTMENT: Electrical
Activity Centre: TRD
Trade: Apprentice Technician OHE /PSI/ RC
Stage: Initial Training Course for Apprentice Technician OHE/ PSI/RC
(ITI, Direct Recruit through RRB) (Common for ALL OHE, PSI & RC)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration | Venue |
Foundation Course | 3 W | ETC | |
ELEC-01 | Foundation, measuring/ Portable tools, safety, First aid, Fire Fighting, material handling& storage, proper up keep of work area. | ||
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | ||
ELEC-1.3 | Reading of drawing, circuit diagrams | ||
ELEC-1.4 | Basic properties of Electrical Materials | ||
Theoretical Training in the allotted streams | 4 W | ETC | |
ELEC-TRD-1.1 | Names, sizes, location of major OHE equipments (Cantilever, Masts, ATD, section insulator, Overlap, turn out, cross over, neutral section etc.) | ||
Foundation Course | 3 W | ETC | |
ELEC-TRD-1.2 | Maintenance schedules, critical points, settings and tolerance of major OHE equipments OLIVER – G | ||
ELEC-TRD-1.3 | Testing, erection and commissioning of major OHE Equipments Thermo-vision Camera | ||
Training in other related stream | 2 W | ETC | |
ELEC-TRD-1.4 | Names, sizes, location of major PSI, substation and remote control equipments (Power transformers, CB, BM, CT, BT, AT, PT, Relays, Batteries, SCADA, Bonding and earthing etc. | ||
ELEC-TRD-1.5 | Maintenance schedules, critical points, settings and tolerance of PSI, substation and remote control equipments | ||
ELEC-TRD-1.6 | Testing, erection and commissioning of PSI, sub-station and remote control equipments | ||
Practical training in OHE | 12 W | Depots/Sites | |
Technical tour | 2 W | Visit to Equipment Manufacturer | |
Training in Computers | 2 W | Trg. Centre/ Computer Centre | |
Examination/Feedback | 1 W | ETC | |
Total | (26 W) |
(Elect 06)
DEPARTMENT: Electrical
Activity Centre: TRD
Trade: Apprentice Technician OHE/ PSI/ RC
Stage: Initial Training Course for Apprentice Technician OHE/ PSI/ RC (Non-ITI)
(Common to ALL OHE, PSI & RC)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration | Venue |
Foundation Course | 3 W | ETC | |
ELEC-01 | Foundation, measuring/ Portable tools, safety, First aid, Fire Fighting, material handling & storage, proper up keep of work area. | ||
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | ||
ELEC-1.3 | Reading of drawing, circuit diagrams | ||
ELEC-1.4 | Basic properties of Electrical Materials | ||
Workshop Technology (Welding, Carpentry, Painting, Soldering, Machine Shop) – Theory | 4 W | ETC | |
Workshop Technology (Welding, Carpentry, Painting, Soldering, Machine Shop) – Practical | 4 W | Shops | |
Theoretical Training in the allotted streams | 4 W | ETC | |
ELEC-TRD-1.1 | Names, sizes, location of major OHE equipments (Cantilever, Masts, ATD, section insulator, Overlap, turn out, cross over, neutral section etc.) | ||
ELEC-TRD-1.2 | Maintenance schedules, critical points, settings and tolerance of major OHE equipments OLIVER- G | ||
ELEC-TRD-1.3 | Testing, erection and commissioning of major OHE Equipments Thermo Vision camera | ||
Training in other related stream | 2 W | ETC | |
ELEC-TRD-1.4 | Names, sizes, location of major PSI, substation and remote control equipments (Power transformers, CB, BM, CT, BT, AT, PT, Relays, Batteries, SCADA, Bonding and earthing etc. | ||
ELEC-TRD-1.5 | Maintenance schedules, critical points, settings and tolerance of PSI, substation and remote control equipments | ||
ELEC-TRD-1.6 | Testing, erection and commissioning of PSI, sub-station and remote control equipments | ||
Practical training in OHE | 56 W | Depots/Sites | |
Technical tour | 2 W | Visit to Equipment Manufacturer | |
Training in Computers | 2 W | Trg. Centre/ Computer Centre | |
Examination/Feedback | 1 W | ETC | |
Total | 78 W |
(Elect 07)
DEPARTMENT: Electrical
Activity Centre: TRD
Trade: Technician (OHE)
(Periodicity once in 5 years)
Stage: Refresher Course for Technician (OHE)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials | |
ELEC-TRD-1.1 | Names, sizes, location of major OHE equipments (Cantilever, Masts, ATD, section insulator, Overlap, tur n out, cross over, neutral section etc) | |
ELEC-TRD-1.2 | Maintenance schedules, critical points, settings and tolerance of major OHE equipments Thermo Vision Camera | |
ELEC-TRD-1.3 | Testing, erection and commissioning of major OHE Equipments Current collection Test/ OLIVER – G | |
ELEC-TRD-1.7 | Codes/ Manuals/ SMIs/ MIs on TRD | |
ELEC-TRD-1.8 | Case studies on failures on OHE | |
Test/Feedback | ||
Total | 02 Weeks |
(Elect 08)
DEPARTMENT: Electrical
Activity Centre: TRD
Trade: Technician PSI/RC
(Periodicity once in 5 years)
Stage: Refresher Course for Technician (PSI/ RC)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical Terms Thermo-vision Camera | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials | |
ELEC-TRD-1.4 | Names, sizes, location of major PSI, substation and remote control equipments (Power transformers, CB, BM, CT, BT, AT, PT, Relays, Batteries, SCADA, Bonding and earthing etc. | |
ELEC-TRD-1.5 | Maintenance schedules, critical points, settings and tolerance of major PSI, substation and remote control equipments | |
ELEC-TRD-1.6 | Testing, erection and commissioning of major PSI, sub-station and remote control equipments | |
ELEC-TRD1.7 | Codes/Manuals/ SMIs/ MIS on TRD | |
ELEC-TRD-1.9 | Case studies on failures of PSI and remote control | |
Test/Feedback | ||
Total | 2 Weeks |
(Elect 09)
DEPARTMENT: Electrical
Activity Centre: TRD
Trade: JE
Stage: Pre-Promotional Course from Sr. Technician/ MCM to JE (TRD)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC Duration 03 Weeks; Venue – Respective- BTC
Module No. | Module Description | Duration |
Elec- 01 | Introduction to railway organization and electric department set up | |
Elec- 2.1 | General Electrical technology, measuring tools/ equipments | |
Elec-2.2 | Safety Rules, precautions, earthling of equipment, accidents, fire fighting, First Aid, safety at work place. | |
Elec-2.3 | Material handling, jigs and fixtures, up keep of work environment | |
Gen-2.1 | Material Management (Store procurement, up keep, records, inventory management | |
Gen-2.2 | Industrial Management, ( DAR, Leave/ Pass Rules) | |
Gen-2.3 | Financial management (Railway Accounting and Financial procedures) | |
Gen-2.4 | Energy conservation | |
Elec-2.4 | Codes/ Manuals/ SMIs/ MIs, pertaining to TRD | |
Elec-TRD-2.1 | Maintenance Schedules OHE, Switching Stations, Traction sub-stations, Powerline crossings, SCADA Thermo-vision Camera & Current Collection Test/ OLIVER –G | |
Elec-TRD-2.2 | Inspection schedules of Officers/ JE, check lists of TRD assets | |
Elec-TRD-2.3 | Testing/ erection/ commissioning of various TRD equipment | |
Elec-TRD-2.4 | Failure investigation/ case studies on panto entanglement, OHE, mast hitting, substation and SCADA failures | |
Genl-2.5 | Disaster management | |
Test/Feedback | ||
Total | 3 Weeks |
(Elect 10)
DEPARTMENT: Electrical Activity Centre: TRD
Trade: Tower Wagon
(Periodicity once in 3 years)
Stage: Refresher Course Tower Wagon Operation And Maintenance
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
Elec-TRD-1.10 | Introduction to Tower Wagon and its types | |
Elec-TRD-1.11 | Location of Important parts and their functions, Prime Mover, Power Transmission, G&SR | |
Elec-TRD-1.12 | Maintenance schedules, critical points, settings and tolerances | |
Elec-TRD-1.13 | Testing, erection and commissioning of a tower wagon | |
Elec-TRD-1.14 | Trouble shooting of a tower wagon | |
Test/Feedback | ||
Total | 1 Week |
(Elect 11)
DEPARTMENT: Electrical
Activity Centre: Electrical (G)
Trade: Technician (Electrical & Plant)
Stage: Pre-Promotional Promotional Course from Unskilled to Technician (Electrical)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials | |
ELEC-1.5 | Names, sizes, location of major power supply equipments (transformers, Relays, contactors, Batteries, Lift ,wiring, electric fittings, meters, switch board , yard lighting and Power line crossing, cranes) Motors, Starters, LED Lighting, Energy Conservation , DG Set , Pumps | |
ELEC-1.6 | Maintenance schedules, critical points, settings and tolerance of major power supply equipments & Earthing Maintenance | |
ELEC-1.7 | Testing, erection and commissioning of major power supply equipments | |
Genl-1.1 | Basics of carpentry and mason trade | |
Test/Feedback | ||
Total | 3 Weeks |
(Elect 12)
DEPARTMENT: Electrical
Activity Centre: Electrical (G) Trade: Technician (TL/AC)
Stage: Pre-Promotional Course from Unskilled to Technician (TL/AC)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area. LHB Coach, Power Car, Pantry car circuit diagram | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials | |
ELEC-1.11 | Names, sizes, location of generating equipments , belts, batteries, electrical fittings, AC plant, Air conditioning of coach, roof mounted, AC package unit | |
ELEC-1.12 | Maintenance schedules, critical points, settings and tolerance of TL/AC equipments Fire Prevention & Safety | |
ELEC-1.13 | Testing, erection and commissioning of TL/AC equipments | |
Test/Feedback | ||
Total | 3 Weeks |
(Elect 13)
DEPARTMENT: Electrical
Activity Centre: Electrical (G)
Trade: Apprentice Technician Electrical
Stage: Initial Training Course for Apprentice Technician (Electrical)
(ITI, Direct Recruit through RRB)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration | Venue |
Foundation Course | 3 W | ||
ELEC-01 | Foundation, measuring/Portable tools, safety, First aid, Fire Fighting, material handling& storage, proper up keep of work area. | ||
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | ||
ELEC-1.3 | Reading of drawing, circuit diagrams | ||
ELEC-1.4 | Basic properties of Electrical Materials | ||
Theoretical Training in the allotted streams | 4 W | ETC | |
ELEC-1.5 | Names, sizes, location of major Electrical equipments (Transformers, Relays, contactors, Batteries, Lift, wiring, electric fittings, meters, switch board, yard lighting and Power line crossing, Escalators, lift, UPS, LED Lighting , DG | ||
ELEC-1.6 | Maintenance schedules, critical points, settings and tolerance of major power supply equipments | ||
ELEC-1.7 | Testing, erection and commissioning of major power supply equipments | ||
Training in other related streams | 2 W | ETC | |
Elec 1.8 | Name, size, location of various plants Escalators, lifts, UPS, (pumps, DG sets) | ||
Elec 1.9 | Maintenance schedules, critical points, settings and tolerance of major plants Escalators, lifts, UPS (pumps, DG sets) | ||
Elec. 1.10 | Testing, erection and commissioning of plants (pumps, DG sets) | ||
Practical training in Power supply | 12 W | Depots/Shops | |
Technical tour | 2 W | Visit to Equipment Manufacturer | |
Training in Computers | 2 W | Trg. Centre/ Computer Centre | |
Examination | 1 W | ETC | |
Total | (26 W) |
(Elect 14)
Activity Centre: Electrical (G)/ Plants
Trade: Apprentice Technician (Electrical)
Stage: Initial Training Course for Apprentice Technician (Electrical)
(Non-ITI)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration | Venue |
Foundation Course | 3 W | ETC | |
ELEC-01 | Foundation, measuring/Portable tools, safety, First aid, Fire Fighting, material handling& storage, proper up keep of work area. | ||
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | ||
ELEC-1.3 | Reading of drawing, circuit diagrams | ||
ELEC-1.4 | Basic properties of Electrical Materials | ||
Workshop Technology (Welding, Carpentry, Painting, Soldering, Machine Shop) – Theory | 4 W | ETC | |
Workshop Technology (Welding, Carpentry, Painting, Soldering, Machine Shop) – Practical | 4 W | Shops | |
Theoretical Training in the allotted streams | 4 W | ETC | |
ELEC-1.5 | Names, sizes, location of major Electrical equipments (Transformers, Relays, contactors, Batteries, Lift, wiring, electric fittings, meters, switch board, yard lighting and Power line crossing, Escalators, Lifts UPS, LED lighting, DG Sets, pumps), cable etc. | ||
ELEC-1.6 | Maintenance schedules, critical points, settings and tolerance of major power supply equipments | ||
ELEC-1.7 | Testing, erection and commissioning of major power supply equipments | ||
Training in other related streams | 2 W | ETC | |
Elec-1.8 | Name, size, location of various plants Lifts & Escalators, UPS (pumps, DG sets) | ||
Elec-1.9 | Maintenance schedules, critical points, settings and tolerance of major plants (pumps, DG sets), Lifts & Escalators | ||
Elec-1.10 | Testing, erection and commissioning of plants (pumps, DG sets) | ||
Practical training in Power supply | 56 W | Depots/Shops | |
Technical tour | 2 W | Visit to Equipment Manufacturer | |
Training in Computers | 2 W | Trg. Centre/ Computer Centre | |
Examination | 1 W | ETC | |
Total | 78 W |
(Elect 15)
Activity Centre: Electrical (G)
Trade: Apprentice Technician (TL/AC)
Stage: Initial Training Course for Apprentice Technician (TL/AC)
(ITI, Direct Recruit through RRB)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration | Venue |
Foundation Course | 3 W | ETC | |
Elect-01 | Foundation, measuring/ Portable tools, safety, First aid, Fire Fighting, material handling & storage, proper up keep of work area. Soft skill & Ethics. | ||
ELEC-1.2 | General Electrical techno logy, and definitions of electrical terms | ||
ELEC-1.3 | Reading of drawing, circuit diagrams | ||
ELEC-1.4 | Basic properties of Electrical Materials | ||
Theoretical Training in the allotted streams | 4 W | ETC | |
ELEC-1.11 | Names, sizes, location of TL/AC equipments viz. generating equipments, belts, batteries, electrical fittings, AC plant, Air conditioning of coach, roof mounted, AC package unit LHB coach, Pantry car & Power car) | ||
ELEC-1.12 | Maintenance schedules, critical points, settings and tolerance of TL/AC equipments LHB coach, Pantry car & Power car) & fire prevention measures | ||
ELEC-1.13 | Testing, erection and commissioning of TL/AC equipments trouble shooting | ||
Training in other related streams | 2 W | ETC | |
Elec-1.8 | Name, size, location of various plants (pumps, DG sets) LHB coach, Pantry car & Power car | ||
Elec-1.9 | Maintenance schedules, critical points, settings and tolerance of major plants (pumps, DG sets) LHB coach, Pantry car & Power car | ||
Elec-1.10 | Testing, erection and commissioning of plants (pumps, DG set) | ||
Practical training in TL/AC | 12 W | Depots/Shops | |
Technical tour | 2 W | Visit to Equipment Manufacturer | |
Training in Computers | 2 W | Trg. Centre/ Computer Centre | |
Examination | 1 W | ETC | |
Total | (26 W) |
(Elect 16)
Activity Centre: Electrical (G)
Trade: Apprentice Technician (TL/AC)
Stage: Initial Training Course for Apprentice Technician (TL/AC) (Non-ITI )
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration | Venue |
Foundation Course | 3 W | ETC | |
ELEC-01 | Foundation, measuring/ Portable tools, safety, First aid, Fire Fighting, material handling & storage, proper up keep of work area. Soft skill & ethics, safety. | ||
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | ||
ELEC-1.3 | Reading of drawing, circuit diagrams | ||
ELEC-1.4 | Basic properties of Electrical Materials | ||
Theoretical Training in the allotted streams | 4 W | ETC | |
Workshop Technology (Welding, Carpentry, Painting, Soldering, Machine Shop) – Theory | ETC | ||
Workshop Technology (Welding, Carpentry, Painting, Soldering, Machine Shop) – Practical | Shops | ||
Theoretical Training in the allotted streams | ETC | ||
ELEC-1.11 | Names, sizes, location of TL/AC equipments viz. generating equipments, belts, batteries, electrical fittings, AC plant, Air conditioning of coach, roof mounted, AC package unit LHB coach, Pantry car & Power car) & Fire prevention measures. | ||
ELEC-1.12 | Maintenance schedules, critical points, settings and tolerance of TL/AC equipments | ||
ELEC-1.13 | Testing, erection and commissioning of TL/AC equipments | ||
Training in other related streams | 2 W | ETC | |
Elec-1.8 | Name, size, location of various plants (pumps, DG sets) | ||
Elec-1.9 | Maintenance schedules, critical points, settings and tolerance of major plants (pumps, DG sets) LHB coach, Pantry car & Power car) | ||
Elec-1.10 | Testing, erection and commissioning of plants (pumps, DG sets) | ||
Practical training in TL/AC | 56 W | Depots/Shops | |
Technical tour | 2 W | Visit to Equipment Manufacturer | |
Training in Computers | 2 W | Trg. Centre/ Computer Centre | |
Examination | 1 W | ETC | |
Total | 78 W |
(Elect 17)
DEPARTMENT: Electrical
Activity Centre: Electrical (G) Trade: Technician (Electrical)
(Periodicity once in 5 years)
Stage: Refresher Course for Technician (Electrical)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials | |
ELEC-1.5 | Names, sizes, location of major Electrical power supply equipments (Transformers, Relays, contactors, Batteries, Lift, wiring, electric fittings, meters, switch board, yard lighting and Power line crossing) Escalators, lifts, UPS, DG Sets. Pumps, starter, Fire prevention measures | |
ELEC-1.6 | Maintenance schedules, critical points, settings and tolerance of major power supply equipments | |
ELEC-1.7 | Testing, erection and commissioning of power supply equipments | |
ELEC-1.14 | Codes/ Manuals/ SMIs/ MIS on Power supply maintenance | |
ELEC-1.15 | Case studies on failures on Power maintenance | |
Test/Feedback | ||
Total | 02 Weeks |
(Elect 18)
DEPARTMENT: Electrical
Activity Centre: Electrical (G)
Trade: Technician (TL/AC)
(Periodicity once in 5 years)
Stage: Refresher Course for Technician (TL/AC)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area, safety. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials | |
ELEC-1.11 | Names, sizes, location of generating equipments , belts, batteries, electrical fittings, AC plant, Air conditioning of coach, roof mounted, AC package unit LHB coach features, and fire prevention measures. | |
ELEC-1.12 | Maintenance schedules, critical points, settings and tolerance of TL/AC equipments | |
ELEC-1.13 | Testing, erection and commissioning of TL/AC | |
ELEC-1.18 | Codes/ Manuals/ SMIs/ MIS on TL/AC maintenance | |
ELEC-1.19 | Case studies on failures on TL/AC | |
Test/Feedback | ||
Total | 02 Weeks |
(Elect 19)
DEPARTMENT: Electrical
Activity Centre: Electrical (G)
Trade: JE (Electrical)
Stage: Pre-Promotional Course from Sr. Technician/MCM to JE (Electrical)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
Elec-01 | Introduction to railway organization and electric department set up | |
Elec-2.1 | General Electrical technology, measuring tools/ equipments | |
Elec–2.2 | Safety Rules, precautions, earthling of equipment, accidents, fire fighting, First Aid, safety of workplace. | |
Elec-2.3 | Material handling, jigs and fixtures, up keep of work environment | |
Gen-2.1 | Material Management (Store procurement, up keep, records, inventory management | |
Gen-2.2 | Industrial Management,( DAR, Leave/ Pass Rules) | |
Gen-2.3 | Financial management (Railway Accounting and Financial procedures) | |
Gen-2.4 | Energy conservation | |
Elec–2.4 | Codes/ Manuals/SMIs/ MIS, pertaining to General services | |
Elec–1.6 | Maintenance Schedule and overhauling of transformer, switchgears, protection devices, AC motors, alternators | |
Elec–1.9 | Maintenance Schedule and overhauling of DG sets and pumps | |
Elec-2.5 | Inspection schedules of Officers/ JE, check lists of general services | |
Elec-1.7 | Testing/ erection/ commissioning of various power supply equipment | |
Elec-1.10 | Testing/ erection/ commissioning of DG Sets and pumps | |
Elec–1.15 | Failure investigation/case studies on power supply | |
Elec–1.17 | Failure investigation/ case studies on failure of plants (DG sets & pumps) | |
Genl–2.5 | Disaster management | |
Test/Feedback | ||
Total | 03 Weeks |
(Elect 20)
DEPARTMENT: Electrical
Activity Centre: Electrical (G)
Trade: JE (TL/AC)
Stage: Pre-Promotional Course from Sr.Technician/ MCM to JE (TL/AC)Place: All these courses will be conducted at concerned Division/BTC/ Zonal ETC
Module No. | Module Description | Duration |
Elec-01 | Introduction to Railway organization and electric department set up | |
Elec-2.1 | General Electrical technology, measuring tools/ equipments | |
Elec–2.2 | Safety Rules, precautions, earthling of equipment, accidents, fire fighting, First Aid, safety of workplace. | |
Elec-2.3 | Material handling, jigs and fixtures, up keep of work environment | |
Gen-2.1 | Material Management (Store procurement, up keep, records, inventory management | |
Gen-2.2 | Industrial Management, (DAR, Leave/ Pass Rules) | |
Gen-2.3 | Financial management (Railway Accounting and Financial procedures | |
Gen-2.4 | Energy conservation | |
Elec-2.4 | Codes/ Manuals/SMIs/ MIS pertaining to General services | |
Elec–1.12 | Maintenance Schedule and overhauling of alternators, regulators, invertors, battery, belts, protection devices, AC plants, air conditioned coaches, roof mounted AC package unit, Hotel Load. | |
Elec–2.5 | Inspection schedules of Officers/ JE, check lists of Coaching TL/AC | |
Elec-1.13 | Testing/ erection/ commissioning of various TL/AC equipment | |
Elec-1.19 | Failure investigation/ case studies on TL/AC | |
Genl-2.5 | Disaster management | |
Test/Feedback | ||
Total | 03 Weeks |
(Elect 21)
DEPARTMENT: Electrical
Activity Centre: Electrical Loco Shed
Trade: Technician (TRS)
Stage: Pre-Promotional Course from Unskilled to Technician (TRS)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling& storage, proper up keep of work area safety. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials | |
ELEC-Loco-1.1 | Over view of Power , auxiliary and control circuit | |
ELEC-Loco-1.2 | Names, sizes, location of major Electric loco equipments (Power transformer, circuit breaker, Panto, Traction and auxiliary motors, Relays, line and auxiliary contactors, Batteries, MP, head light and marker light, bogie, wheels, couplers, brake rigging, compressor, exhausters and pneumatic valves) of Convectional Loco or Three Phase Loco (Types of loco available in particular shed) | |
ELEC-Loco-1.3 | Maintenance schedules, critical points, settings and tolerance of Electric loco equipments. | |
ELEC-Loco-1.4 | Testing, erection and commissioning of Electric loco equipments. | |
Test/Feedback | ||
Total | 3 Weeks |
(Elect 22)
DEPARTMENT: Electrical
Activity Centre: Electrical (TRS)
Trade: Apprentice Technician (TRS)
Stage: Initial Training Course for Apprentice Technician (TRS)
(ITI, Direct Recruit through RRB)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration | Place |
Foundation course | 3 W | ETC | |
ELEC-01 | Foundation, measuring/ Portable tools, safety, First aid, Fire Fighting, material handling& storage, proper up keep of work area. | ||
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | ||
ELEC-1.3 | Reading of drawing, circuit diagrams | ||
ELEC-1.4 | Basic properties of Electrical Materials | ||
Theoretical Training in the allotted streams | 4 W | ETC | |
ELEC-Loco-1.1 | Over view of Power, auxiliary and control circuit | ||
Training in other related stream | 2 W | ETC | |
ELEC EMU-1.1 | Rake formation, classification of coaches | ||
ELECEMU-1.2 | Over view of Power, auxiliary and control circuit | ||
ELEC EMU-1.3 | Names, sizes, location of major equipments of EMU/MEMU | ||
ELEC-EMU-1.4 | Maintenance schedules, critical points, settings and tolerance of major EMU equipments | ||
ELEC-EMU-1.5 | Testing, erection and commissioning of major EMU equipments | ||
Practical training in Loco | 12 W | Sheds/Shops | |
Technical tour | 2 W | Visit to Equipment Manufacturer | |
Training in Computers | 2 W | Trg. Centre/ Computer Centre |
(Elect 23)
DEPARTMENT: Electrical
Activity Centre: Electrical Loco Shed
Trade: Apprentice Technician (TRS)
Stage: Initial Training Course for Apprentice Technician (TRS)
(Non-ITI)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration | Place |
Foundation course | |||
Elect-01 | Foundation, measuring/ Portable tools, safety, First aid, Fire Fighting, material handling & storage, proper up keep of work area. | ||
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | ||
ELEC-1.3 | Reading of drawing, circuit diagrams | ||
ELEC-1.4 | Basic properties of Electrical Materials | ||
Workshop Technology (Welding, Carpentry, Painting, Soldering, Machine Shop) – Theory | 4 W | ETC | |
Workshop Technology (Welding, Carpentry, Painting, Soldering, Machine Shop) – Practical | 4 W | Shops | |
Theoretical Training in the allotted streams | 4 W | ETC | |
ELEC-Loco-1.1 | Over view of Power, auxiliary and control circuit of Locomotives. | ||
ELEC-Loco-1.2 | Names, sizes, location of major Electric loco equipments of Convectional Loco or Three Phase Loco (Types of loco available in particular shed) | ||
ELEC-Loco-1.3 | Maintenance schedules, critical points, settings and tolerance of major Electric loco equipments | ||
ELEC-Loco-1.4 | Testing, erection and commissioning of major Electric loco equipments | ||
Training in other related stream | 2 W | ETC | |
ELEC- EMU-1.1 | Rake formation, classification of coaches | ||
ELEC-EMU-1.2 | Over view of Power, auxiliary and control circuit | ||
ELEC- EMU-1.3 | Names, sizes, location of major equipments of EMU/MEMU | ||
ELEC-EMU-1.4 | Maintenance schedules, critical points, settings and tolerance of major EMU equipments | ||
ELEC-EMU-1.5 | Testing, erection and commissioning of major EMU equipments | ||
Practical training in Loco | 56 W | Sheds/Shops | |
Technical tour | 2 W | Visit to Equip Manufacturer | |
Training in Computers | 2 W | ETC | |
Examination | 1 W | ETC | |
Total | 78 W |
(Elect 24)
Activity Centre: Electrical Loco Shed
Trade: Technician (TRS)
(Periodicity once in 5 years)
Stage: Refresher Course for Technician/ Sr.Technician (TRS)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-Loco-1.2 | Names, sizes, location of major Electric loco equipments of Convectional Loco or Three Phase Loco (Types of loco available in particular shed ) Newly Added (Power transformers, circuit breaker, Pan to, Relays, line and auxiliary contactors, Batteries, MP, head light and marker light, bogie, wheels, couplers, brake rigging, compressor, exhausters and pneumatic valves | |
ELEC-Loco-1.3 | Maintenance schedules, critical points, settings and tolerance of major Electric loco equipments | |
ELEC-Loco-1.4 | Testing, erection and commissioning of major Electric loco equipments | |
ELEC-Loco-1.5 | Codes/ Manuals/ SMIs/ MIS on Elect Loco | |
ELEC-Loco-1.6 | Case studies on failures of Elect Loco | |
Test/Feedback | ||
Total | 2 Weeks |
(Elect 25)
Activity Centre: Electrical Loco Shed
Trade: JE(TRS)
Stage: Pre-Promotional Course from Sr. Technician/ MCM to JE (TRS)Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
Elec-01 | Introduction to Railway organization and electric department set up | |
Elec-2.1 | General Electrical technology, measuring tools/ equipments | |
Elec-2.2 | Safety Rules, precautions, earthling of equipment, accidents, fire fighting, First Aid | |
Elec-2.3 | Material handling, jigs and fixtures, up keep of work environment | |
Gen-2.1 | Material Management (Store procurement, up keep, records, inventory management | |
Gen-2.2 | Industrial Management, (DAR, Leave/ Pass Rules) | |
Gen-2.3 | Financial management (Railway Accounting and Financial procedures) | |
Gen-2.4 | Energy conservation | |
Elec-2.4 | Codes/ Manuals/ SMIs/ MIS, pertaining to loco | |
Elec-Loco-2.1 | Maintenance Schedules and overhauling of Electric loco equipment viz. TFP, RSI, SL, TM, RS, DJ, contactors, relays, lights, arno, auxiliary machines, etc. | |
Elec-loco-2.2 | Maintenance Schedule and overhauling of Mechanical equipment viz bogies, suspension, brake rigging, wheels, gears, couplers, etc. | |
Elec-loco-2.3 | Maintenance Schedule and overhauling of compressor, exhauster, valves, panto, etc. | |
Elec-loco-2.4 | Inspection schedules of Officers/ JE, check lists of electric locomotives | |
Elec-loco-2.5 | Testing/ erection/ commissioning of various loco equipment | |
Elec-loco-2.6 | Failure investigation/ case studies on electric locomotives | |
Genl-2.5 | Disaster management | |
Test/Feedback | ||
Total | 3 Weeks |
(Elect 26)
Activity Centre: EMU /MEMU CAR SHED/WORKSHP
Trade: Technician (TRS-EMU/MEMU)
Stage: Pre-Promotional Course from Unskilled to Technician (TRS- EMU/MEMU)
Place: All these courses will be conducted at concerned Division/BTC/Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area safety. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials | |
ELEC-EMU-1.1 | Rake formation, classification of coaches | |
ELEC-EMU-1.2 | Over view of Power , auxiliary and control circuit | |
ELEC-EMU-1.3 | Names, sizes, location of major EMU equipments Three phase or Conventional (Type available in Shed) (Power transformers, circuit breaker, Panto, Relays, line and auxiliary contactors, Batteries, MP, head light and marker light, bogie, wheels, couplers, brake rigging, compressor, exhausters and pneumatic |
(Elect 27)
Activity Centre: EMU /MEMU CAR SHED/WORKSHP
Trade: Apprentice Technician (TRS-EMU/ MEMU)
Stage: Initial Training Course for Apprentice Technician (TRS-EMU/ MEMU)
(ITI, Direct Recruit through RRB)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration | Place |
Foundation course | 3 W | ETC | |
ELEC-01 | Foundation, measuring/Portable tools, safety, First aid, Fire Fighting, material handling& storage, proper up keep of work area safety. | ||
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | ||
ELEC-1.3 | Reading of drawing, circuit diagrams | ||
ELEC-1.4 | Basic properties of Electrical Materials | ||
Theoretical Training in the allotted streams | 4 W | ETC | |
ELEC- EMU-1.1 | Rake formation, classification of coaches | ||
ELEC-EMU-1.2 | Over view of Power, auxiliary and control circuit of EMU. | ||
ELEC-EMU-1.3 | Names, sizes, location of major EMU equipments Three phase or Conventional (Type available in Shed) | ||
ELEC-EMU-1.4 | Maintenance schedules, critical points, settings and tolerance of major EMU equipments | ||
ELEC-EMU-1.5 | Testing, erection and commissioning of major EMU equipments | ||
Training in other related streams | 2 W | ETC | |
ELEC-Loco-1.1 | Over view of Power , auxiliary and control circuit of Loco | ||
ELEC- Loco-1.2 | Names, sizes, location of major equipments of Elec. Loco Three phase Loco/ Conventional | ||
ELEC-Loco-1.3 | Maintenance schedules, critical points, settings and tolerance of major Loco equipments Three phase/ Conventional. | ||
ELEC-Loco-1.4 | Testing, erection and commissioning of major Loco Equipments Three phase/ Conventional | ||
Practical training in EMU/ MEMU Three phase/ Conventional | 12 W | Sheds/Shops | |
Technical tour | 2 W | Visit to Equipment Manufacturer | |
Training in Computers | 2 W | Trg. Centre/ Computer Centre | |
Examination | 1 W | ETC | |
Total | (26 W) |
(Elect 28)
Activity Centre: EMU/MEMU CAR SHED/ WORKSHP
Trade: Apprentice Technician (TRS -EMU/ MEMU)
Stage: Initial Training Course for Apprentice Technician (TRS-EMU/ MEMU)
(Non-ITI)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration | Place |
Foundation course | 3 W | ETC | |
Elect-01 | Foundation, measuring/Portable tools, safety, First aid, Fire Fighting, material handling & storage, proper up keep of work area safety. | ||
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | ||
ELEC-1.3 | Reading of drawing, circuit diagrams | ||
ELEC-1.4 | Basic properties of Electrical Materials | ||
Workshop Technology (Welding, Carpentry, Painting, Soldering, Machine Shop) – Theory | 4 W | ETC | |
Workshop Technology (Welding, Carpentry, Painting, Soldering, Machine Shop) – Practical | 4 W | Shops | |
Theoretical Training in the allotted streams | 4 W | ETC | |
ELEC- EMU-1.1 | Rake formation | ||
ELEC-EMU-1.2 | Over view of Power, auxiliary and control circuit of EMU. | ||
ELEC-EMU-1.3 | Location of major equipments in EMU (Type available in Shed) | ||
ELEC-EMU-1.4 | Maintenance schedules, critical points, settings and tolerance of major EMU/ MEMU equipments | ||
ELEC-EMU-1.5 | Testing, erection and commissioning of major EMU/ MEMU equipments | ||
Training in other related stream | 2 W | ETC | |
ELEC-LOCO-1.1 | Power Control and Aux circuit of Loco. | ||
ELEC-Loco-1.2 | Names, sizes, location of major equipments of Loco | ||
ELEC-Loco-1.3 | Maintenance schedules, critical points, settings and tolerance of Major Loco equipments | ||
ELEC-Loco-1.4 | Testing, erection and commissioning of major Loco equipments | ||
Practical training in EMU/ MEMU | 56 W | Sheds/ Shops | |
Technical Tour | 2 W | Visit to Equip Manufacturer | |
Training in Computers | 2 W | Trg. Centre/ Computer Centre | |
Examination | 1 W | ETC | |
Total | 78 W |
(Elect 29)
DEPARTMENT: Electrical
Activity Centre: EMU /MEMU CAR SHED/WORKSHP
Trade: Technician EMU/MEMU
(Periodicity once in 5 years)
Stage: Refresher Course for Technician (TRS-EMU/ MEMU)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
ELEC-1.1 | Basic Knowledge about tools, safety, First aid, material handling & storage, proper up keep of work area. | |
ELEC-1.2 | General Electrical technology, and definitions of electrical terms | |
ELEC-1.3 | Reading of drawing, circuit diagrams | |
ELEC-1.4 | Basic properties of Electrical Materials, safety | |
ELEC-EMU-1.3 | Names, sizes, location of major Electric loco equipments (Power transformers, circuit breaker, Pan to, Relays, line and auxiliary contactors, Batteries, MP, head light and marker light, bogie, wheels, couplers, brake rigging, compressor, exhausters and pneumatic valves) | |
ELEC-EMU-1.4 | Maintenance schedules, critical points, settings and tolerance of major EMU equipments | |
ELEC-EMU-1.5 | Testing, erection and commissioning of major EMU equipments | |
ELEC-EMU-1.6 | Codes/ Manuals/ SMIs/ MIs on EMU/ MEMU | |
ELEC-EMU-1.7 | Case studies on failures of EMU/ MEMU | |
Test/Feedback | ||
Total | 02 Weeks |
(Elect 30)
DEPARTMENT: Electrical
Activity Centre: EMU/MEMU
Trade: JE (EMUMEMU)
Stage: Pre-Promotional Course from Sr.Technician/ MCM to JE (EMU/ MEMU)
Place: All these courses will be conducted at concerned Division/ BTC/ Zonal ETC
Module No. | Module Description | Duration |
Introduction to Railway organization and electric department set up | ||
Elec-2.1 | General Electrical technology, measuring tools/ equipments | |
Elec–2.2 | Safety Rules, precautions, earthing of equipment, accidents, fire fighting, First Aid, etc. | |
Elec-2.3 | Material handling, jigs and fixtures, up keep of work environment | |
Gen-2.1 | Material Management (Store procurement, up keep, records, inventory management | |
Gen-2.2 | Industrial Management, (DAR, Leave/ Pass Rules) | |
Gen-2.3 | Financial management (Railway Accounting and Financial procedures) | |
Gen-2.4 | Energy conservation | |
Elec-2.4 | Codes/ Manuals/ SMIs/ MIS, pertaining to EMU | |
Elec-EMU-1.1 | Rake formation | |
Elec-EMU-2.2 | Maintenance Schedules and overhauling of EMU equipment viz. TFP, TM, DJ, contactors, relays, lights, arno, auxiliary machines | |
Elec-EMU-2.3 | Maintenance Schedule and overhauling of Mechanical equipment viz bogies, suspension, brake rigging, wheels, gears, couplers | |
Elec-EMU-2.4 | Maintenance Schedule and overhauling of Pneumatic Equipment’s exhauster, valves, panto | |
Elec-EMU-2.5 | Inspection schedules of Officers/ JE, check lists of EMU | |
Elec-EMU-2.6 | Testing/ erection/ commissioning of various EMU equipment | |
Elec-EMU-2.7 | Failure investigation/ case studies on EMU | |
Genl-2.5 | Disaster management | |
Test/Feedback | ||
Total | 3 Weeks |
Download Railway Board Circular RBE No.87/2022
Forward reference ⇒ RBE No.