RBE No. 198/2018: Creation of Posts – New Assets – Work Study Reports

No.E(MPP)2018/1/11, dated 19.12.2018

Sub: Creation of posts for New Assets – “Pool of Surrendered Posts” – Posts surrender due to Work Study Reports.
Ref: Railway Board’s letter No.E(MPP)2010/1/6 (RBE No. 127/2016) and E(MPP)2018/1/1, dated 04.04.2018 (RBE No. 52/2018)

1. In partial modification to Board’s letter under reference, below mentioned decision of Board (MS, FC, CRB) are conveyed for compliance. Posts identified for surrender due to Work Study Reports shall henceforth be dealt as under:-

(a) 15% of the money value for any post surrendered now onwards through Work Study Reports should be transferred to Railway Board. Normally minimum 50% share will be kept for Division and 35% for HQ. GMs can further increase the share of the Divisions, if they want.
(b) DRMs may create safety as well as other than safety category posts from the “pool of surrendered posts” on a 1:1 basis for new assets as well as existing assets.

2. This issues with the concurrence of Finance Directorate of the Ministry of Railways.

Download Railway Boar Circular RBE No. 198/2018

Forward reference⇒RBE No. 48/2020

Leave a Reply

Your email address will not be published. Required fields are marked *