RBE No. 93/2011: MACPS – Modified Assured Career Progression Scheme – Graduate Engineers
No.PC-V/2009/ACP/2, dated 20.06.2011
S.No.PC-VI/265
Sub: Grant of financial up-gradation under MACPS to the direct recruit Graduate Engineers of drawing Cadre – Clarification reg.
1. Kindly refer to Board’s letter dated 28.09.1998 (RBE No.223/1998) regarding allotment of pay scales to Drawing, Design and Estimating Staff, wherein inter alia, instructions were also issued stating that Engineering Graduates recruited in the scale of 5500-9000 be promoted to the scale of 6500-10500 against 20% DR quota on the basis of LDCE.
2. Subsequent to the introduction of the MACP Scheme, the issue regarding grant of financial up-gradation under MACP Scheme to the Engineering Graduates recruited in pay scale of 5500-9000 prior to 01.09.2008 at par with Engineering Graduates recruited in pay scale of Rs.6500-10500 has been under examination in consultation with Department of Personnel & Training (DoP&T), the nodal of Government on MACP Scheme.
3. In this connection, it is clarified that Engineering Graduates recruited initially in the grade of Rs.5500-9000 & promoted to Rs.6500-10500 against the 20% DR quota in terms of Board’s letter dated 28.09.1998 (RBE No.223/1998) ibid be treated at par with the fresh recruits in the scale of Rs.6500-10500 w.e.f. the date they were promoted to the pay scale of Rs.6500-10500 for the purpose of MACP Scheme.
4. This issues with the concurrence of the Finance Directorate of the Ministry of Railways.
5. Hindi version is enclosed.