Incentive: RBE No.122/2000 – Revision of Scheme
No.91/M(W)/964/126/Pt, dated 20.06.2000
Sub: Revision of Incentive Scheme.
Ref: Board’s letter of even number dated 17.12.1999 (RBE No.310/1999).
1. The subject of review of Incentive Scheme at Wheel & Axle Plant has been reconsidered by the Board. The Board has now decided as under:-
(i) The plant capacity and standard man-hours shall be as follows:-
| Plant Capacity | |
| Wheel | 8300/month |
| Axle | 4200/month |
| Standard Man-hours | |
| Wheel shops | 87414 |
| Axle shops | 41724 |
These shall be subject to annual review.
(ii) No Bonus limit shall be 83% of plant capacity.
(iii) Incentive rates shall be based on the minimum of the pay scale of Gr.II operator and shall be:
| Wheel shops | Rs.0.58/wheel |
| Axle shops | Rs.1.15/axle |
1. These changes will be made applicable w.e.f. 01.09.1999.
3. All other factors would remain same as conveyed vide this office letter referred to above.
4. This issues with the concurrence of Finance Directorate.
Download Railway Board Circular RBE No.122/2000
Forward reference ⇒ RBE No.